Skip to content

CERC · Central Electricity Regulatory Commission

Draft Power Market Regulations, 2020 — Explanatory Memorandum

Draft Central Electricity Regulatory Commission (Power Market) Regulations, 2020 Explanatory Memorandum

Explanatory memorandum to a draftReleased with the notice dated 18 Jul 2020

Draft

The draft has since been finalised as the Power Market Regulations, 2021.

Explanatory memorandum to the Power Market Regulations, 2020 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is CERC's explanatory memorandum for the draft CERC (Power Market) Regulations, 2020, which would replace the 2010 Power Market Regulations (p1, p5). It explains why CERC is revising the market framework and walks through the proposed provisions; the operative draft clauses are quoted inside the memorandum, but the memorandum itself is not the regulation.

Section 1 sets out the market context: capacity and demand growth, rising renewable share, growth in power-exchange and bilateral short-term volumes, and the launch of the real-time market. It identifies drivers — demand growth, deeper short-term markets, need for capacity and ancillary products, information exchange and stronger market monitoring — and states that the 2020 draft would repeal the 2010 regulations (p1–5).

Section 2 maps the draft's structure: Part 1 definitions; Part 2 scope and contracts covered; Part 3 contract features and price discovery; Part 4 power exchanges; Part 5 market coupling; Part 6 OTC platforms; Part 7 market oversight (p5–6).

Section 3 is the substantive rationale. It explains proposed price-discovery principles for day-ahead and real-time contracts (p6); revised definitions for intraday and contingency contracts (p6–7); term-ahead contracts following the Ministry of Power committee report on electricity derivatives and SEBI/CERC jurisdiction (p7–10); and the power-exchange regime (p10–32) covering eligibility, registration and renewal, registration charges, net worth, ownership and shareholding limits, governance and independent directors, bye-laws and business rules, senior management, membership categories, transaction fee, trading margin and facilitator service charge, approval or suspension of contracts and bid types, clearing and settlement, IT and algorithm audit, congestion amount, information dissemination, market surveillance, revocation and grievance redressal. It then explains market coupling (p32–33), OTC platforms (p33–34), and market oversight, including definitions of market manipulation, insider trading and cartelization (p34–39).

Section 4 states the repeal and savings position: the 2010 regulations would be repealed, with existing orders, directions, approvals and appointments continuing in force (p39).

Standard name
Power Market Regulations
Primary topics
Power markets and exchanges, Electricity trading and trading margin, Licensing and licence conditions

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (2)

Proposed changes (drafts with no final yet)

Earlier drafts

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document