Skip to content

CERC · Central Electricity Regulatory Commission

Power Market Regulations, 2020 — Draft

Central Electricity Regulatory Commission (Power Market) Regulations, 2020

Draft regulationDated 18 Jul 2020No. L-1/257/2020/CERC dated 18th July, 2020

Draft

A proposal that has since been finalised as the Power Market Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission issued this draft on 18 July 2020 as No. L-1/257/2020/CERC (p1). It contains the proposed Central Electricity Regulatory Commission (Power Market) Regulations, 2020, made under s.66 and s.178 of the Electricity Act, 2003 and para 5.7.1(f) of the National Electricity Policy, to take effect from publication in the Official Gazette and to replace the 2010 Power Market Regulations on commencement (p1, p39). It is a consultation draft: the text is headed 'NOTIFICATION (DRAFT)' and the Commission states it acts after previous publication (p1).

Part 1 (pp1-8) carries the short title and commencement and defines the market's vocabulary - contract types, participants, exchange governance terms, and misconduct concepts such as insider trading, market manipulation, circular trading and cartelization. Part 2 (pp8-9) fixes scope: power exchanges, market participants other than exchanges, and the OTC market; and lists the contract types covered - day-ahead, real-time, intraday, contingency and term-ahead delivery contracts, other contracts including capacity and ancillary services, RECs, ESCerts, and OTC contracts.

Part 3 (pp9-12) specifies how contracts work: price discovery by exchanges or by a Market Coupling Operator on the principle of maximising economic surplus, double-sided closed-bid auction and a uniform clearing price with market splitting under transmission congestion for day-ahead and real-time; Commission-approved mechanisms on the exchange's proposal for intraday, contingency and term-ahead; conditions on annulment/curtailment and settlement; and OTC price discovery, scheduling routes and physical-delivery settlement.

Part 4 (pp12-32) is the core. It sets eligibility, application, public-notice, grant, renewal, fees and revocation for power exchange registration; ownership limits and governance (board composition, independent directors, disqualifications); management qualifications; membership categories and reporting; transaction fee, trading margin and contract approval; risk management; clearing and settlement through a Payment and Settlement Systems Act entity, with transitional Settlement Guarantee Fund rules and a default waterfall; IT and algorithm audit; information dissemination; market surveillance; annual reporting; exit scheme; and grievance redressal.

Part 5 (pp32-33) creates the Market Coupling regime - objectives, designation of a Market Coupling Operator and its functions. Part 6 (pp33-35) covers OTC platform registration, eligibility, obligations and revocation. Part 7 (pp35-38) sets market oversight: objectives, data collection, inquiry and investigation, intervention powers including price floor/cap and suspension of trading, interim orders and inspection. Part 8 (pp38-39) holds saving of inherent powers, removal of difficulties, power to relax, and repeal of the 2010 regulations with savings.

Forms I to XV (pp40-54) prescribe the exchange's periodic reporting formats, on a monthly cycle, to the Secretary, CERC and through the Saudamini (E-monitoring) portal.

Standard name
Power Market Regulations
Primary topics
Power markets and exchanges, Electricity trading and trading margin, Congestion and curtailment

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (2)

Proposed changes (drafts with no final yet)

Earlier drafts

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document