Skip to content

CERC · Central Electricity Regulatory Commission

Power Market Regulations, 2021

Central Electricity Regulatory Commission (Power Market) Regulations, 2021

Regulation · Gazette copyDated 15 Feb 2021Published in the Gazette 16 Jun 2021No. L-1/257/2020/CERC dated 15th February, 2021

The Gazette copy of the Power Market Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 65 of 76. Check the regulator's original before you rely on it.

The CERC (Power Market) Regulations, 2021 (p45) are the framework instrument for organised electricity trading: they license and govern power exchanges and over-the-counter (OTC) platforms, define what may be traded, and lay down the conduct, risk, settlement and surveillance duties that trading venues owe to the Commission and to the system operator. They were issued on 15 February 2021 and gazetted on 16 June 2021 (pp1, 45), but Regulation 1(2) says they take effect only from a date the Commission notifies separately (p45).

Part I (pp45–49) gives the short title and commencement and defines the vocabulary of market conduct and contracts — collective and continuous transactions, day-ahead, real-time, intraday, contingency and term-ahead contracts, market coupling and market splitting, insider and insider trading, market manipulation, circular trading, unpublished price sensitive information, the Settlement Guarantee Fund and net worth.

Part 2 (p49) fixes scope: the regulations bind power exchanges, other market participants and the OTC market, and list the tradable contracts — delivery-based exchange contracts (including capacity and ancillary services contracts the Commission approves), REC and ESCert contracts, and delivery-based OTC contracts.

Part 3 (pp50–51) specifies features of contracts: double-sided closed-bid auction price discovery maximising economic surplus with a uniform clearing price and market splitting on congestion; scheduling and delivery in coordination with NLDC/LDC under the Grid Code and Open Access Regulations; transmission charges and losses under the Sharing Regulations; separate treatment for intraday, contingency and term-ahead contracts; a bar on annulment or curtailment except for transmission constraints; and the OTC price-discovery and delivery route.

Part 4 (pp51–64) is the core licensing and conduct code for power exchanges: objectives; eligibility and application procedure with public notice; grant and renewal of registration; annual registration charge; continuous net worth; ownership and shareholding limits; governance and director fit-and-proper requirements; the subjects bye-laws, rules and business rules must cover; senior management staffing; three membership categories; member reporting; fee caps; approval or suspension of contracts; a risk management committee; clearing and settlement through a Settlement Guarantee Fund with a default waterfall; IT, algorithm-audit and cyber-security duties; deviation settlement and indemnities for system operators; congestion-amount handling; price and volume disclosure; a surveillance department and committee reporting quarterly; annual reporting; an exit scheme; revocation of registration; and grievance redressal.

Part 5 (pp64–65) creates market coupling — objectives, designation of a Market Coupling Operator, and a clause postponing the whole framework until the Commission decides under separate regulations. Part 6 (p65 onwards) sets up a separate registration regime for OTC platforms.

Standard name
Power Market Regulations
Primary topics
Power markets and exchanges, Licensing and licence conditions, Electricity trading and trading margin

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (1)

Proposed changes (drafts with no final yet)

Earlier drafts

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document