PSERC · Punjab State Electricity Regulatory Commission
Generation, Transmission, Wheeling and Retail Supply Tariff (4th Amendment) Regulations, 2024 — Order on objections
Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and retail supply tariff) (4th amendment) Regulation, 2024.
OrderDated 17 Sep 2024
Replaced by a later regulation Voltaic does not hold
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Read with the Generation, Transmission, Wheeling and Retail Supply Tariff (MYT) Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's order on the draft PSERC Multi-Year Tariff (MYT) 4th Amendment Regulations, 2024. It records the consultation — draft notified through a newspaper public notice dated 28.06.2024, objections due 26.07.2024, public hearing held 07.08.2024 (p1) — disposes of the two objections received (PSTCL and PSPCL), and states the amendments the Commission approves.
The draft reached across the principal MYT Regulations, 2022. Regulation 3 would have extended the auxiliary energy consumption definition to cover the Emission Control System (ECS) and defined ECS (p1–2); Regulation 18 would have added ECS to the change-of-law additional capitalisation ground (p2); Regulation 20 added a return-on-equity proviso for change-of-law additional capitalisation (p3); and Regulation 21 laid out depreciation mechanics for ECS assets, distinguished by when the ECS is commissioned relative to the station's useful life (p3–5). Regulation 23 recast interest on loan capital onto a normative SBI MCLR-linked basis and deleted and renumbered clauses (p5–7); Regulation 25 redefined gross fixed assets for O&M and added a note on ECS O&M expenses (p7–8); Regulation 30 shortened the billing payment period (p8–9); Regulations 32, 42 and 50 shortened receivables/working-capital periods and dropped a power-procurement-cost deduction (p9–11); Regulation 34 widened the performance-parameter norms to water and reagent consumption (p10).
Crucially, the Commission deferred the ECS-related amendments (Regulations 3, 18, 21 and 25) to the draft MYT Regulations for the next control period, because FGDs are not expected in the current control period, while the interest-on-loan and working-capital changes were allowed to proceed (p2, p5, p8). PSPCL's Regulation 34 suggestion was partly accepted (p10). The order closes by approving the 4th Amendment Regulations, 2024 with modifications as discussed (p12).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 4 Dec 2023MYT Regulations, 2022 — 3rd Amendment, 2023 — Order
One more document belongs here and is not on Voltaic: a procedure or order made under it not held as English text.
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.