Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2022 — 2nd Amendment, 2023

Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) (2nd Amendment) Regulations, 2023

AmendmentDated 2 Jun 2023Published in the Gazette 5 Jun 2023PSERC/Secy/Regu. 176 dated The 2nd June, 2023

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Amends the Generation, Transmission, Wheeling and Retail Supply Tariff (MYT) Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page gazette notification by which PSERC makes the Second Amendment to its 2022 tariff-determination regulations (p1). Clause 1 names the amendment regulations and provides that they come into force from the date of their notification in the State official gazette (p1). Clause 2 substitutes Regulation 47 of the Principal Regulations in full: the Fuel Cost Adjustment (FCA) mechanism is replaced by a "Fuel and Power Purchase Adjustment Surcharge" (FPPAS), under which any change in fuel cost, power purchase cost and transmission charges, measured against the cost of supply approved by the Commission, is calculated and billed to consumers (p1). Notably, the operative formula and billing manner are not set out here — they are deferred to the PSERC (Conduct of Business) Regulations, 2005, as amended (p1). A closing note records the parent regulations and the first amendment (p1).

Standard name
Tariff Regulations
Primary topics
Fuel and power purchase cost adjustment

Read with this

One more document belongs here and is not on Voltaic: a procedure or order made under it not held as English text.

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document