Skip to content

PSERC · Punjab State Electricity Regulatory Commission

4th MYT Regulations, 2025

PSERC 4th MYT Regulations 2025

AmendmentDated 20 Aug 2025Published in the Gazette 21 Aug 2025

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Amends the Generation, Transmission, Wheeling and Retail Supply Tariff (MYT) Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

PSERC's fourth multi-year tariff regulation, notified on 20 August 2025 and gazetted on 21 August 2025 (p1), lays down the terms and conditions on which the Commission will determine generation, intra-state transmission, SLDC, wheeling and retail supply tariffs. It extends to the whole State of Punjab and runs for the fourth Control Period, 1 April 2026 to 31 March 2029 (p1, p4). Renewable energy sources are expressly outside its tariff scope (p1–2).

Part I (pp1–10) fixes title, commencement and extent and defines roughly seventy terms used across the regulation — control period, effective date, ARR, allocation statement, declared capacity, cut-off date, change in law, integrated mine and similar.

Part II (pp10–21) sets the framework: separate accounts and ARRs for generation, distribution, wheeling, retail supply, transmission and SLDC businesses, with auditor-certified allocation statements until segregation is achieved; a Business Plan and Capital Investment Plan for the whole Control Period, with DPR requirements and an emergency-works route; classification of ARR elements as controllable, normative or uncontrollable; the MYT petition, annual true-up and tariff-reset process; gain/loss sharing; and end-of-period review.

Part III (pp21–24) lists the components of tariff for each business. Part IV (pp24–36) supplies the common building blocks — capital cost admissibility, additional capitalisation, debt-equity, return on equity, depreciation, foreign exchange variation, interest on loan and working capital, the O&M expense formula, prior period expenses, non-tariff income, income from other business, sharing of gains and losses, billing and late payment, and regulatory asset creation.

Part V (pp36–43) covers generation: working capital, infirm power and deviations, performance norms (largely aligned to CERC norms or set by the Commission), landed fuel cost, formula-driven recovery of thermal and hydro capacity charges, energy charge rates, incentives, scheduling and metering. Part VI (pp43–47) covers distribution: working capital, distribution loss definition and trajectory, power procurement, transmission and SLDC charges, bad debts, FPPAS, cross-subsidy and state subsidy, and maintenance charges payable to the State Government. Part VII (pp47–50) covers transmission and SLDC: availability norms for recovery and incentive, substation auxiliary consumption, open access charges, transmission loss allocation, monthly transmission charge formulae and recovery of SLDC charges.

Part VIII (pp50–51) sets filing requirements and timelines for the business plan, MYT petition and annual true-up, the disposal window for petitions, publication duties and a summary timeline table. Part IX (pp51–52) preserves the Commission's powers to issue practice directions, remove difficulties, relax, waive (for an integrated utility), interpret and amend. Annexure A (p53) gives the default percentages for allocating distribution business costs and income between wheeling and retail supply.

Standard name
Multi Year Tariff Regulations

Read with this

One more document belongs here and is not on Voltaic: a procedure or order made under it not held as English text.

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document