Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2022 — 4th Amendment, 2024

Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) (4th Amendment) Regulations, 2024

AmendmentDated 17 Sep 2024Published in the Gazette 18 Sep 2024No. PSERC/Secy/Regu. 190 dated The 17th September, 2024

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Amends the Generation, Transmission, Wheeling and Retail Supply Tariff (MYT) Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the fourth amending instrument to the PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2022 — the "Principal Regulations" — issued by the Punjab State Electricity Regulatory Commission under s.181(2) read with ss.61 and 62 of the Electricity Act, 2003 (p1). It is short, operative and entirely textual: seven clauses that insert, substitute, delete or renumber provisions of the parent regulation.

Clause 1 gives the short title and states that the amendment takes effect from the date of publication in the State's official gazette (p1). Clauses 2 and 3 deal with the cost of capital. Clause 2 adds a proviso to Regulation 20 on return on equity for additional capitalisation arising from a change in law, cross-referring to Regulation 23.1 and prescribing a ceiling (p1). Clause 3 rewrites Regulation 23.1 to fix the basis for interest and finance charges on loan capital — a market-linked benchmark plus a spread, or the borrower's weighted average rate, whichever is lower — deletes clause 23.2 and renumbers the remaining clauses (p1–2).

Clauses 4 to 7 tighten working-capital and payment parameters across the generation, transmission, wheeling and retail supply chains: shortening the billing/late-payment period in Regulation 30.2, reducing the receivable and inventory holding periods in the components of working capital (Regulation 32) and aligning the corresponding interest-on-working-capital clauses (Regulations 42 and 50) (p2). A closing Note lists the parent regulation and the three earlier amendments (p2).

Standard name
Tariff Regulations
Primary topics
Return, financing and working capital, Late payment surcharge and rebate, Capital cost and investment

Read with this

One more document belongs here and is not on Voltaic: a procedure or order made under it not held as English text.

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗