PSERC · Punjab State Electricity Regulatory Commission
Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2022 — 4th Amendment, 2024
Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) (4th Amendment) Regulations, 2024
AmendmentDated 17 Sep 2024Published in the Gazette 18 Sep 2024No. PSERC/Secy/Regu. 190 dated The 17th September, 2024
Replaced by a later regulation Voltaic does not hold
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Amends the Generation, Transmission, Wheeling and Retail Supply Tariff (MYT) Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the fourth amending instrument to the PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2022 — the "Principal Regulations" — issued by the Punjab State Electricity Regulatory Commission under s.181(2) read with ss.61 and 62 of the Electricity Act, 2003 (p1). It is short, operative and entirely textual: seven clauses that insert, substitute, delete or renumber provisions of the parent regulation.
Clause 1 gives the short title and states that the amendment takes effect from the date of publication in the State's official gazette (p1). Clauses 2 and 3 deal with the cost of capital. Clause 2 adds a proviso to Regulation 20 on return on equity for additional capitalisation arising from a change in law, cross-referring to Regulation 23.1 and prescribing a ceiling (p1). Clause 3 rewrites Regulation 23.1 to fix the basis for interest and finance charges on loan capital — a market-linked benchmark plus a spread, or the borrower's weighted average rate, whichever is lower — deletes clause 23.2 and renumbers the remaining clauses (p1–2).
Clauses 4 to 7 tighten working-capital and payment parameters across the generation, transmission, wheeling and retail supply chains: shortening the billing/late-payment period in Regulation 30.2, reducing the receivable and inventory holding periods in the components of working capital (Regulation 32) and aligning the corresponding interest-on-working-capital clauses (Regulations 42 and 50) (p2). A closing Note lists the parent regulation and the three earlier amendments (p2).
Read with this
The regulation
Amendments and corrections
- Dated 2 Jun 2023Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2022 — 2nd Amendment, 2023
- Dated 20 Aug 20254th MYT Regulations, 2025
Commencement notices and reasons
One more document belongs here and is not on Voltaic: a procedure or order made under it not held as English text.
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.