PSERC · Punjab State Electricity Regulatory Commission
MYT Regulations, 2022 — 3rd Amendment, 2023 — Order
In the matter of Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) regulations, 2022 (PSERC MYT Regulations 2022).
OrderDated 4 Dec 2023
Replaced by a later regulation Voltaic does not hold
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Read with the Generation, Transmission, Wheeling and Retail Supply Tariff (MYT) Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is PSERC's order of 04.12.2023 disposing of public objections and approving the draft Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) (3rd Amendment) Regulations, 2023, which amend the PSERC MYT Regulations, 2022 (p1). The stated trigger is the Ministry of Power's Electricity (Second Amendment) Rules, 2023, framed to streamline subsidy accounting and payment and establish a framework for financial sustainability (p1). A draft was published, a newspaper notice was issued on 28.09.2023, and a public hearing was held on 25.10.2023; four objectors — three individual homestay operators and PSPCL — filed objections, with PSPCL replying on 27.10.2023 and PSTCL filing a nil reply on 07.11.2023 (p1).
The approved amendments run under four heads. A new clause 9.20 to Regulation 9 makes prudent distribution-system capex a pass-through, subject to three provisos: consistency with the Commission-approved capex roll-out plan, competitive and transparent procurement, and geo-tagging with proper entry in the Fixed Asset Register (p2). Regulation 44 is changed twice: clause 44.3 substitutes the reference to the PSERC Renewable Purchase Obligation Regulations, 2011 with the 2022 Regulations, and a new clause 44.4 makes prudent power-procurement costs for 24x7 supply under the Electricity (Rights of Consumers) Rules, 2020 and for meeting the Resource Adequacy plan a pass-through, conditional on transparent procurement or Commission-approved price (p3–4). A new Regulation 48(A) is purely a linking provision pointing to Regulation 53 of the PSERC (Conduct of Business) Regulations, 2005 (p4).
On analysis, the Commission records PSPCL's objection that geo-tagging of HT/LT assets is not presently feasible and should be de-linked from the pass-through proviso, notes PSTCL's nil reply, and states the amendment follows the Ministry of Power's Rule-20 framework (p2–3). It treats clause 44.4 as in line with the Electricity (Second Amendment) Rules, 2023 (p4), and holds that the substantive subsidy change sits in the Conduct of Business (7th Amendment) Regulations, 2023, dealt with by a separate order of the same date (p5). The three homestay objectors' request to place BnB units in the Domestic Service Tariff category is rejected as outside the scope of these amendments and as already covered by the Order of 09.08.2023 in Petition No. 35 of 2023 (p5–7). The Commission then approves the 3rd Amendment Regulations as discussed (p7).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
One more document belongs here and is not on Voltaic: a procedure or order made under it not held as English text.
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.