Approval of Detailed Energy Accounting Procedure for Deviation Settlement Mechanism and Related Matters, 2026 — Order

Approval of the Detailed Energy Accounting Procedure for Deviation Settlement Mechanism and Related Matters framed by the State Load Despatch Centre (SLDC) under Clauses 11(i) and 15(vi) of the Bihar Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2025

OrderDated 29 Sep 2026

Made under the Deviation Settlement Mechanism and Related Matters Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

BERC approves the Detailed Energy Accounting Procedure for the Deviation Settlement Mechanism framed by the SLDC, subject to three modifications, and disposes of the matter. The order records that the BERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2025 — notified 12.02.2026 — require SLDC to frame a detailed procedure for energy accounting and commercial settlement of deviation charges, consult stakeholders and obtain the Commission's approval (p1). SLDC circulated a draft on 10.03.2026 with comments due 17.03.2026, later sought clarifications by letter dated 20.05.2026, and the Commission answered those in an order dated 22.09.2026 (p1–2).

The first modification substitutes para 5(I)(c) of the Procedure. Data for billing Partial Open Access Consumers moves from SLDC to the billing centre of the concerned distribution licensee, which raises and settles those bills; energy accounting for partial open access consumers connected to the intra-state transmission system and for all open access consumers on the distribution network is to follow the 2018 Intra-State Open Access Regulations and not form part of the Deviation Settlement Mechanism; and such consumers must declare drawal schedules in 15-minute time blocks separately to SLDC and the DISCOM (p2).

The second modification replaces the bank guarantee or revolving letter of credit required at registration of a QCA with the payment regime in Regulation 12 of the DSM Regulations — payment timelines for deviation charges, late payment surcharge, a letter-of-credit obligation on entities that defaulted in the previous financial year, and encashment on continued default (p2–3). The third fixes a definite timeline for SLDC's Annual Surplus Utilisation Scheme in respect of any surplus in the State Deviation Pool Account (p3).

SLDC must issue and upload the modified final procedure within fourteen days, and it takes effect from that publication, binding all State Entities and QCAs (p3).

Standard name
DSM Regulations
Primary topics
Energy accounting and settlement, Deviation settlement (DSM), Open access

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document