Deviation Settlement Mechanism and Related Matters Regulations, 2025 — Statement of Reasons

Bihar Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2025

Statement of reasonsDated 6 Jan 2026SMP-31/2025 dated 06.01.2026

The commission's reasons for the Deviation Settlement Mechanism and Related Matters Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software, from pages 1 to 54 of 56. Check the regulator's original before you rely on it.

What it is. A suo-motu order of the Bihar Electricity Regulatory Commission, case SMP-31/2025, dated 06.01.2026 (p1). It has two halves: a Statement of Reasons that explains the need for new intra-state deviation settlement rules and disposes of every stakeholder comment on the draft (pp1–36), and the approved regulation text annexed as Annexure-A (pp37 onwards).

Why it was made. The SoR records that the National Electricity Policy and Tariff Policy require Availability Based Tariff to be extended to intra-state entities, that BERC had earlier notified its (Intra-State ABT and Deviation Settlement Mechanism) Regulations, 2020 in line with CERC's 2014 DSM Regulations, and that the framework now needs realigning with CERC's DSM Regulations, 2024 as amended (pp2–3). A draft regulation and consultative paper were hosted for comment, with public notices in three newspapers on 15.8.2025, comments closing 08.09.2025 and public hearings on 11.09.2025 and 18.09.2025 (p3).

The consultation record. Pages 4–35 are stakeholder-wise tables (NBPDCL/SBPDCL, SLDC, BSPHCL(PMC), SJVN, RAP, Tata Power) setting out each proposed modification and the Commission's view. They cover the scope of applicability, sharing of contract data with SLDC, metering and AMR, SLDC's despatch authority, frequency-linked buyer charges and volume limits, infirm power payment, use of the pool-account surplus, the energy-accounting procedure, the settlement cycle, the letter-of-credit requirement, a force-majeure/grid-emergency waiver clause and the role of the Qualified Coordinating Agency for RE pooling stations. Accepted changes include moving to a monthly settlement cycle (p13) and a four-month transition period after notification (p25). The Commission then directs publication of the revised regulations in the Official Gazette (p36).

The regulation. Annexure-A sets commencement, objective, definitions, scope, adherence to schedule, duties of SLDC and State Entities, computation of deviation for general sellers, WS sellers and buyers, the Normal Rate (highest of IDAM/RTM weighted average area clearing prices or a blended formula including ancillary service cost), the charges-for-deviation tables by seller and buyer category with frequency bands and volume limits, the State Deviation Pool Account and its accounting, payment timelines, late-payment surcharge and LC, reactive energy management, and compliance with SLDC instructions (pp37–54).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Scheduling and despatch

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗