BERC · Bihar Electricity Regulatory Commission
Bihar (Deviation Settlement Mechanism and Related Matters) Regulations, 2025 — Draft
Bihar Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2025
Draft regulationDated 14 Aug 2025
Draft
A proposal that has since been finalised as the Deviation Settlement Mechanism and Related Matters Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a consultation package issued by the Bihar Electricity Regulatory Commission (p1). The first page explains that the National Electricity Policy and the Tariff Policy require intra-state availability-based tariff and a credible settlement mechanism for intra-day transfers, and that the existing BERC (Intra-State ABT and DSM) Regulations, 2020 need to be aligned with the CERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2024 and later amendments (p1). It announces a suo-motu proceeding to frame new BERC DSM Regulations, 2025 and invites comments, suggestions and objections by 08.09.2025, with a public hearing on 11.09.2025 at 11:30 A.M. (p1).
The attached draft regulation (pp2–19) is made under Section 181 of the Electricity Act, 2003. It contains short title and commencement provisions, with commencement on notification in the Bihar Official Gazette (p2); sets the objective of securing schedule adherence through a commercial mechanism (p2); and defines the entities, transactions and charging concepts used in the scheme (pp2–7). Its scope covers grid-connected intra-state entities in Bihar under the SLDC control area — distribution licensees, deemed distribution licensees and partial and full open-access consumers — with a proviso bringing in RE-based generating stations connected to the intra-state transmission system with exportable capacity of 5 MW or more (p7). It imposes schedule adherence, duties on SLDC and state entities, and computation rules for deviation by general sellers, WS sellers and buyers (pp7–9).
The core of the draft is the charging framework: the normal rate of deviation charges and category-specific charges for general sellers, run-of-river hydro, municipal solid waste, wind/solar/hybrid sellers, standalone energy storage, WS-plus-ESS and buyers, linked in most cases to grid frequency and volume limits (pp9–16). It then specifies the State Deviation Pool Account, weekly accounting, payment schedule, late-payment and letter-of-credit consequences, reactive-energy management, compliance with SLDC instructions, and powers to relax, amend, remove difficulty and interpret, along with repeal and savings for the 2020 regulations (pp16–19).
Read with this
The regulation
Commencement notices and reasons
Procedures and orders made under it
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.