BERC · Bihar Electricity Regulatory Commission
DSM Regulations, 2025 — Clarification Order on SLDC Energy Accounting Procedure
Clarification on issues raised by SLDC along with Submission of Detailed Accounting Procedure under Clauses 11(i) and 15(vi) of the BERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2025
OrderDated 22 Sep 2026
Made under the Deviation Settlement Mechanism and Related Matters Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a three-page clarification order by the Bihar Electricity Regulatory Commission responding to points raised by the State Load Despatch Centre (SLDC) in connection with the Detailed Energy Accounting Procedure that SLDC is required to frame under Clauses 11(i) and 15(vi) of the BERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2025. The background (p1) records the notification of those Regulations on 12.02.2026, SLDC's stakeholder circulation of the draft procedure (Letter No. 132 dated 10.03.2026, comments by 17.03.2026), and SLDC's subsequent submission and clarification request (letter no. 273 dated 20.05.2026).
The Commission then disposes of three points (pp1–3). On bagasse/biomass sugar mills, it accepts SLDC's proposal and clarifies that the deviation charges under Regulation 9(C) of the 2025 Regulations apply to bagasse- and biomass-based renewable energy plants (p2). On partial open access consumers, it reads the Regulation 3 definition of 'Buyer' — reproduced in the order — as covering only InSTS-connected full open access consumers, and says partial open access consumers fall outside it (p2). On NTPC Barauni's suggestion, it clarifies that the State Deviation Pool Account under Regulation 10(e) shall be charged for payment to the seller for over-injection and to the buyer for under-drawal, as applicable (p3).
On the two points where stakeholders wanted alignment with the CERC DSM framework, the Commission declines to amend the Regulations and instead invites SLDC to file a separate petition if it wishes to pursue a change (pp2–3). The matter is disposed of with the clarifications (p3).
Read with this
The regulation
Commencement notices and reasons
Procedures and orders made under it
Earlier drafts
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.