Skip to content

BERC · Bihar Electricity Regulatory Commission

Renewable Purchase Obligation, its Compliance and REC Framework Implementation Regulations, 2010

Bihar Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance and REC Framework Implementation) Regulations, 2010

RegulationDated 16 Nov 2010Published in the Gazette 18 Nov 2010BERC-Regl-01/10 dated 16th November 2010

2 amendments to it are on Voltaic, the latest dated 29 Mar 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Bihar Electricity Regulatory Commission issued these principal regulations under ss. 61, 66, 86(1)(e) and 181 of the Electricity Act 2003. They were published in the Bihar Gazette on 18 November 2010 and come into force from that publication (p1). They extend to the whole State of Bihar and create the State's renewable purchase obligation (RPO) and REC compliance framework.

Regulation 2 defines core terms, including obligated entity, certificate, renewable energy sources, floor price, forbearance price and state agency (pp1–3). Regulation 3 applies the RPO to distribution licensees and to consumers using conventional captive generation of 5MW and above or conventional open-access/third-party supply (p3). Regulation 4 sets annual RPO percentages for FY 2010-11 to 2014-15, with a solar-specific carve-out, an in-state sourcing preference, reporting duties and a power to revise targets (pp3–4). Regulation 5 treats CERC-issued RECs as valid compliance instruments, distinguishing solar and non-solar certificates and requiring deposit with the Commission (p4).

Regulations 6–8 cover the State Agency's accreditation and monitoring role, distribution licensee estimation in tariff/annual performance review petitions and shortfall treatment, and captive/open-access consumer reporting and REC use (pp4–5). Regulation 9 provides the default fund, penalty and carry-forward mechanism (pp5–6). Regulations 10–15 establish compliance auditors and a monitoring committee, give the regulations overriding effect over listed BERC instruments and orders, and preserve the Commission's powers to remove difficulties, issue directions, depart from procedure and amend (pp6–7).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

Amendments and corrections

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document