Draft Renewable Purchase Obligation, its Compliance and REC Framework Implementation Regulations, 2025 — Consultative Paper

Consultative Paper on Draft Bihar Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance, and REC Framework Implementation) Regulations, 2025

Public notice on a draftDated 21 Mar 2025

Draft

Voltaic holds no final regulation made from this draft.

Public notice on a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a BERC consultative paper that publishes a full draft consolidation of its RPO and REC framework regulations and invites stakeholder comments (p1–4). It traces the 2010 principal regulations (Bihar Gazette No. 753 dated 18.11.2010), the first amendment of 7.9.2012, the second amendment of 30.3.2017 aligned to the Revised Tariff Policy of 28.1.2016, the third amendment of 18.12.2018 following the MoP letter of 14.6.2018, and the fourth amendment of 27.6.2023 incorporating the MoP order of 22.07.2022, corrigendum of 19.9.2022 and Green Energy Open Access Rules of 6.6.2022 (p1). It says the immediate trigger is MoP notification S.O. 4617(E) dated 20.10.2023, which added distributed renewable energy and changed hydro purchase obligation, so BERC proposes to consolidate all prior amendments into one framework (p1–2).

The draft regulations (pp4–16) are made under Electricity Act 2003 ss 61, 66, 86(1)(e) and 181. Clauses 1–3 cover title, Gazette commencement, Bihar extent, definitions and applicability to distribution licensees, captive power consumers and open access consumers (pp4–7). Clause 4 is the core: it sets a source-wise RPO trajectory for FY 2025-26 to FY 2029-30 across Wind, Hydro Power Obligation, Distributed Renewable Energy and Other RPO, with rules on eligible projects, free hydro power, DRE installations below 10 MW and a conversion multiplier for unmetered DRE (pp7–9). It also lists compliance routes—own generation, open access, RECs, green hydrogen/ammonia, bundled power and prosumer supply—and allows the Commission to revise targets (pp10–11).

Clauses 5–15 cover REC validity and proof, the State Agency/BREDA role and half-yearly reporting, distribution licensee ARR/MYT disclosure, captive/open access annual reporting, default funds and section 142 penalties, carry-forward on genuine difficulty, compliance auditors and a monitoring committee, overriding effect over four BERC regulations, removal of difficulties, directions and amendment power (pp11–16). Annexure I provides the half-yearly compliance format for the State Agency (pp17–18). The order is undated; comments are due by 11.4.2025 and the hearing is set for 16.4.2025 at 11.30 AM (p3).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

Amendments and corrections

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.