BERC · Bihar Electricity Regulatory Commission
Draft Renewable Purchase Obligation, its Compliance and REC Framework Implementation Regulations, 2025 — Consultative Paper
Consultative Paper on Draft Bihar Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance, and REC Framework Implementation) Regulations, 2025
Public notice on a draftDated 21 Mar 2025
Draft
Voltaic holds no final regulation made from this draft.
Public notice on a draft that is not on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a BERC consultative paper that publishes a full draft consolidation of its RPO and REC framework regulations and invites stakeholder comments (p1–4). It traces the 2010 principal regulations (Bihar Gazette No. 753 dated 18.11.2010), the first amendment of 7.9.2012, the second amendment of 30.3.2017 aligned to the Revised Tariff Policy of 28.1.2016, the third amendment of 18.12.2018 following the MoP letter of 14.6.2018, and the fourth amendment of 27.6.2023 incorporating the MoP order of 22.07.2022, corrigendum of 19.9.2022 and Green Energy Open Access Rules of 6.6.2022 (p1). It says the immediate trigger is MoP notification S.O. 4617(E) dated 20.10.2023, which added distributed renewable energy and changed hydro purchase obligation, so BERC proposes to consolidate all prior amendments into one framework (p1–2).
The draft regulations (pp4–16) are made under Electricity Act 2003 ss 61, 66, 86(1)(e) and 181. Clauses 1–3 cover title, Gazette commencement, Bihar extent, definitions and applicability to distribution licensees, captive power consumers and open access consumers (pp4–7). Clause 4 is the core: it sets a source-wise RPO trajectory for FY 2025-26 to FY 2029-30 across Wind, Hydro Power Obligation, Distributed Renewable Energy and Other RPO, with rules on eligible projects, free hydro power, DRE installations below 10 MW and a conversion multiplier for unmetered DRE (pp7–9). It also lists compliance routes—own generation, open access, RECs, green hydrogen/ammonia, bundled power and prosumer supply—and allows the Commission to revise targets (pp10–11).
Clauses 5–15 cover REC validity and proof, the State Agency/BREDA role and half-yearly reporting, distribution licensee ARR/MYT disclosure, captive/open access annual reporting, default funds and section 142 penalties, carry-forward on genuine difficulty, compliance auditors and a monitoring committee, overriding effect over four BERC regulations, removal of difficulties, directions and amendment power (pp11–16). Annexure I provides the half-yearly compliance format for the State Agency (pp17–18). The order is undated; comments are due by 11.4.2025 and the hearing is set for 16.4.2025 at 11.30 AM (p3).
Read with this
The regulation
Amendments and corrections
- Dated 7 Sep 20121st Amendment to RPO Regulations, 2012
- Dated 29 Mar 20172nd Amendment to RPO Regulations, 2017
Proposed changes (drafts with no final yet)
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.