Skip to content

BERC · Bihar Electricity Regulatory Commission

2nd Amendment to RPO Regulations, 2017

AmendmentDated 29 Mar 2017Published in the Gazette 30 Mar 2017Case No. SMP 42/2016 dated The 29th March 2017

Amends the Renewable Purchase Obligation, its Compliance and REC Framework Implementation Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A short amendment to Bihar's 2010 rules on renewable purchase obligation (RPO) and the REC framework, notified in the Bihar Gazette Extraordinary of 30 March 2017, with the Commission's order dated 29 March 2017 under Case No. SMP 42/2016 (p1). It is the Second Amendment to the 2010 regulations, extends to the whole of Bihar, and takes effect from Gazette publication (p1).

Regulation 2 replaces the definition of "Renewable Energy Sources" in Regulation 2(1)(P) with a list of non-conventional generating sources — small/mini/micro hydro, wind, solar, biomass including husk and bagasse-based cogeneration, and urban/municipal solid waste — as approved by the Ministry of New and Renewable Energy or by the State of Bihar (p1).

Regulation 3 rewrites Regulation 3.1(ii), widening the set of obligated entities to persons consuming electricity from conventional captive plants of 1 MW and above, cogeneration from non-renewable sources, and conventional power procured through open access or third-party sale (p1–2).

Regulation 4 substitutes the first proviso to Regulation 4.1, replacing the purchase-obligation trajectory with a year-wise table running from FY 2016-17 to FY 2021-22 that splits the obligation between total, solar and non-solar renewable power, measured against total consumption excluding hydro from FY 2019-20 onward (p2). It also confirms that renewable energy bought through bundled power counts toward compliance to the extent of the renewable content, and requires distribution licensees to procure 100% of power generated from waste-to-energy plants in the state (p2).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document