BERC · Bihar Electricity Regulatory Commission
Renewable Purchase Obligation and REC Framework Implementation Regulations, 2025 — 1st Amendment, 2026 — Draft
Bihar Electricity Regulatory Commission (Renewable Purchase Obligation, its compliance and REC Framework Implementation) (1st Amendment) Regulation 2026
Published with a draftDated 17 Sep 2026Notice No. 11 dated 17.09.2026
Draft
Voltaic holds no final regulation made from this draft.
Published with the draft Renewable Purchase Obligation, its Compliance and REC Framework Implementation Regulations, 2025 — Consultative Paper.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment to the Bihar Electricity Regulatory Commission's renewable purchase obligation (RPO) and REC framework regulations. A public notice dated 17.09.2026 announces Suo-Motu Proceedings No. SMP-40/2026, invites written comments by 08.10.2026 and schedules a public hearing on 13.10.2026 (p1). The draft regulation extends to Bihar and would come into force on publication in the official Gazette, but no Gazette date is printed (p2).
The operative part inserts new clauses into Regulation 4.1 of the principal 2025 Regulations. It excludes nuclear electricity from RPO for all obligated entities (p3); sets the RPO base for open access consumers on grid drawal and for captive users on self-consumption excluding auxiliary consumption, with exclusions for specified waste heat recovery, waste energy recovery, fossil-based cogeneration and aluminium smelter consumption (p3); and bases distribution licensees' RPO on supply within their periphery, excluding open access consumption from non-DISCOM sources and captive self-consumption (p4). A storage-linked component of RPO is prescribed by financial year, with storage energy counting toward other RPO heads and periodic review (p4). A new Regulation 4.2(E) adds compliance through direct renewable consumption or storage and through payment of the CERC buyout price, with proceeds routed to the Central Energy Conservation Fund and partly to State Energy Conservation Funds (pp4–5). The existing Annexure-I is replaced with worked RPO calculation examples (pp6–7), and a new Annexure-II prescribes reporting formats for distribution licensees and for captive and open access consumers (pp8–9).
Read with this
The regulation
Amendments and corrections
- Dated 7 Sep 20121st Amendment to RPO Regulations, 2012
- Dated 29 Mar 20172nd Amendment to RPO Regulations, 2017
Proposed changes (drafts with no final yet)
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.