BERC · Bihar Electricity Regulatory Commission
RPO, its Compliance and REC Framework Implementation Regulations, 2010 — 4th Amendment, 2022 — Consultative Paper — Draft
Consultative paper on the proposal for 4th amendment in the BERC (Renewable Purchase Obligation, its Compliance and REC Framework Implementation) Regulations, 2010
Draft amendmentDated 22 Aug 2022
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Bihar Electricity Regulatory Commission's consultative paper on a proposed fourth amendment to its 2010 Regulations on Renewable Purchase Obligation, compliance and the REC framework. Pages 1–3 explain why the Commission is acting: the original 2010 notification and its first (2012) and second (2017) amendments, the Revised Tariff Policy of 28.01.2016, MoP's long-term RPO trajectory communications and its order of 22.07.2022 specifying separate wind, hydro and other RPO for FY 2022-23 to FY 2029-30, MNRE's 2019 letter pressing the State to align, and the Green Energy Open Access Rules, 2022. It invites comments by 12.09.2022 and fixes a hearing for 27.09.2022 at 11.30 AM (p1–3).
Pages 4–10 carry the draft amendment itself. It extends to the whole of Bihar and comes into force on Gazette publication (p4). It adds definitions of 'green energy' and 'prosumer' and carries forward future amendments to the principal Regulations (p5). The core is Regulation 4: a substituted 4.1 sets annual source-wise obligations — Wind RPO, Hydro Power Obligation and Other RPO — for FY 2022-23 to 2029-30, with project eligibility cut-off dates for wind and large hydro/pumped storage, rules on using free hydro power for HPO, cross-category flexibility for shortfalls, treatment of bundled power and prosumer energy, compulsory procurement from waste-to-energy plants, and periodic review (p6–7). A new 4.1(a) creates an energy storage obligation trajectory from FY 2023-24 with a minimum renewable share of stored energy (p7–8). A substituted 4.2 imposes a uniform RPO and lists the routes to comply — own generation, open access purchase, RECs, and green hydrogen or green ammonia (p8–9). Regulation 6.3 is replaced with half-yearly reporting by the State Agency (p9), and Regulation 11 gives the regulations overriding effect over four named BERC regulations (p9–10). Annexure I (pp11–12) is the half-yearly compliance format the State Agency must submit.
Read with this
The regulation
Amendments and corrections
- Dated 7 Sep 20121st Amendment to RPO Regulations, 2012
- Dated 29 Mar 20172nd Amendment to RPO Regulations, 2017
Proposed changes (drafts with no final yet)
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.