Skip to content

BERC · Bihar Electricity Regulatory Commission

RPO, its Compliance and REC Framework Implementation Regulations, 2010 — 4th Amendment, 2022 — Consultative Paper — Draft

Consultative paper on the proposal for 4th amendment in the BERC (Renewable Purchase Obligation, its Compliance and REC Framework Implementation) Regulations, 2010

Draft amendmentDated 22 Aug 2022

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Bihar Electricity Regulatory Commission's consultative paper on a proposed fourth amendment to its 2010 Regulations on Renewable Purchase Obligation, compliance and the REC framework. Pages 1–3 explain why the Commission is acting: the original 2010 notification and its first (2012) and second (2017) amendments, the Revised Tariff Policy of 28.01.2016, MoP's long-term RPO trajectory communications and its order of 22.07.2022 specifying separate wind, hydro and other RPO for FY 2022-23 to FY 2029-30, MNRE's 2019 letter pressing the State to align, and the Green Energy Open Access Rules, 2022. It invites comments by 12.09.2022 and fixes a hearing for 27.09.2022 at 11.30 AM (p1–3).

Pages 4–10 carry the draft amendment itself. It extends to the whole of Bihar and comes into force on Gazette publication (p4). It adds definitions of 'green energy' and 'prosumer' and carries forward future amendments to the principal Regulations (p5). The core is Regulation 4: a substituted 4.1 sets annual source-wise obligations — Wind RPO, Hydro Power Obligation and Other RPO — for FY 2022-23 to 2029-30, with project eligibility cut-off dates for wind and large hydro/pumped storage, rules on using free hydro power for HPO, cross-category flexibility for shortfalls, treatment of bundled power and prosumer energy, compulsory procurement from waste-to-energy plants, and periodic review (p6–7). A new 4.1(a) creates an energy storage obligation trajectory from FY 2023-24 with a minimum renewable share of stored energy (p7–8). A substituted 4.2 imposes a uniform RPO and lists the routes to comply — own generation, open access purchase, RECs, and green hydrogen or green ammonia (p8–9). Regulation 6.3 is replaced with half-yearly reporting by the State Agency (p9), and Regulation 11 gives the regulations overriding effect over four named BERC regulations (p9–10). Annexure I (pp11–12) is the half-yearly compliance format the State Agency must submit.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Energy storage obligation

Read with this

Amendments and corrections

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document