Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Formats - Distribution (Form D1–D34)

Formats - Distribution

OrderDate not stated

Replaced by Generation, Transmission, Wheeling and Retail Supply Tariff (MYT) Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software, from pages 1 to 41 of 58. Check the regulator's original before you rely on it.

Pages 1–41 of this 58-page document are a set of filing formats, Form D1 to Form D34, for a distribution licensee's Annual Revenue Requirement and tariff petition. The index on p1 lists all forms and says they must be filed for the distribution business with wheeling and retail supply shown separately, consistent with an Allocation Statement mentioned in "the Regulations"; electronic Word and Excel copies are required, and the formats may be amended or supplemented (p1).

Forms D1–D6 build the core ARR and energy picture: D1 gives the ARR summary (p2); D2 and D3 summarise fixed and variable power purchase from own stations and other sources, including central stations, NRSE, banking, IPPs/traders, short-term power and UI (pp3–7); D4 gives month-wise station-wise purchase details (p8); D5 covers energy sales, consumer numbers and connected load/contracted demand by voltage and category (pp9–11); D6 gives voltage-wise and availability-versus-requirement energy balances (pp12–13).

Forms D7–D10 cover capital expenditure, loan financing, capital work in progress and capitalisation, with scheme codes for EHV, distribution, metering, capacitor and SCADA/DMS works (pp14–19). D11–D14 address subsidy, weighted average interest on actual loans, interest and finance charges, and working capital for wheeling and retail supply (pp21–24). D15–D16 cover fixed assets/depreciation and return on equity (pp25–27). D17–D20 provide O&M summaries, normative O&M for the control period, employee expenses, administration & general expenses and repair & maintenance (pp28–32). D21–D23 cover non-tariff income, consumer security deposit, bad debts/write-offs and prior-period income/expenses (pp33–36). D24–D25(B) give existing and proposed category-wise tariff and revenue from current tariff and other charges, tracked by category and voltage (pp37–41). The index also lists D26–D34 for revenue from proposed tariff, transmission charges, deviation charges, network characteristics, arrears, key ratios, employee strength and income-tax provisions.

Standard name
Multi Year Tariff Regulations
Primary topics
Tariff determination, ARR and true-up, Wheeling and retail supply tariff

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document