Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2019

Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2019

RegulationDated 29 May 2019Published in the Gazette 30 May 2019In force from 1 Apr 2020No. PSERC/Secy/Regu140.- dated The 29th May, 2019

Replaced by Generation, Transmission, Wheeling and Retail Supply Tariff (MYT) Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software, from pages 1 to 25 of 43. Check the regulator's original before you rely on it.

These are the Punjab State Electricity Regulatory Commission's multi-year tariff regulations for the second Control Period, notified on 29 May 2019 and published in the extraordinary Gazette on 30 May 2019 (p1). They come into force on 1 April 2020 and run to 31 March 2023 unless the Commission directs otherwise, and they extend only to Punjab (p1).

The Regulations lay down the terms and conditions on which PSERC will determine generation, transmission, wheeling and retail supply tariffs, SLDC fees and charges, and the surcharge on wheeling for open access — under sections 61, 62, 64, section 32(3) and the first proviso to section 42(2). Renewable energy sources are expressly outside the tariff scope (p1–2).

Part I (pp1–8) states the scope and defines roughly seventy terms, including Control Period, Effective Date, cut-off date, and what makes a plant, system or business 'existing' or 'new'.

Part II (pp8–18) is the MYT machinery. It requires a Business Plan and Capital Investment Plan, separate ARR filings for generation, transmission, SLDC, wheeling and retail supply with allocation statements until accounts are segregated, an MYT application, annual performance review and true-up filings each year, and an end-of-Control-Period review. It classifies every ARR element as controllable, normative or uncontrollable, and provides for sharing gains and losses and for carrying cost.

Part III (pp18–20) lists what each tariff is built from: capacity and energy charges for thermal and hydro generation; network usage and reactive power charges for transmission plus SLDC charges; and the wheeling and retail supply ARR components.

Part IV (from p20) sets common principles for all businesses — capital cost and its components, additional capitalisation, the debt-equity norm, return on equity, depreciation, foreign exchange rate variation and income tax. Pages 26–43 are not available.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page