PSERC · Punjab State Electricity Regulatory Commission
Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2019
Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2019
RegulationDated 29 May 2019Published in the Gazette 30 May 2019In force from 1 Apr 2020No. PSERC/Secy/Regu140.- dated The 29th May, 2019
Replaced by Generation, Transmission, Wheeling and Retail Supply Tariff (MYT) Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 25 of 43. Check the regulator's original before you rely on it.
These are the Punjab State Electricity Regulatory Commission's multi-year tariff regulations for the second Control Period, notified on 29 May 2019 and published in the extraordinary Gazette on 30 May 2019 (p1). They come into force on 1 April 2020 and run to 31 March 2023 unless the Commission directs otherwise, and they extend only to Punjab (p1).
The Regulations lay down the terms and conditions on which PSERC will determine generation, transmission, wheeling and retail supply tariffs, SLDC fees and charges, and the surcharge on wheeling for open access — under sections 61, 62, 64, section 32(3) and the first proviso to section 42(2). Renewable energy sources are expressly outside the tariff scope (p1–2).
Part I (pp1–8) states the scope and defines roughly seventy terms, including Control Period, Effective Date, cut-off date, and what makes a plant, system or business 'existing' or 'new'.
Part II (pp8–18) is the MYT machinery. It requires a Business Plan and Capital Investment Plan, separate ARR filings for generation, transmission, SLDC, wheeling and retail supply with allocation statements until accounts are segregated, an MYT application, annual performance review and true-up filings each year, and an end-of-Control-Period review. It classifies every ARR element as controllable, normative or uncontrollable, and provides for sharing gains and losses and for carrying cost.
Part III (pp18–20) lists what each tariff is built from: capacity and energy charges for thermal and hydro generation; network usage and reactive power charges for transmission plus SLDC charges; and the wheeling and retail supply ARR components.
Part IV (from p20) sets common principles for all businesses — capital cost and its components, additional capitalisation, the debt-equity norm, return on equity, depreciation, foreign exchange rate variation and income tax. Pages 26–43 are not available.
Read with this
Amendments and corrections
Procedures and orders made under it
- Date not statedFormats - Distribution (Form D1–D34)
- Date not statedTransmission and SLDC ARR and Tariff Petition Formats
- Date not statedGeneration Formats (Forms G1–G33(B))