PSERC · Punjab State Electricity Regulatory Commission
Generation Formats (Forms G1–G33(B))
Formats - Generation
OrderDate not stated
Replaced by Generation, Transmission, Wheeling and Retail Supply Tariff (MYT) Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the generation-side formats annexure of the Commission's multi-year tariff framework — a blank pro-forma set, not a tariff order. Page 1 is an index running from Form G1 to Form G33(B), covering annual revenue requirement, O&M (summary, normative and sub-heads), employee cost and strength, A&G, R&M, fixed assets and depreciation, SLDC fees and charges, return on equity, loan master, capital expenditure and capital works in progress, interest and finance charges, prior-period items, write-offs, a generation cost summary, plant characteristics for thermal and hydro stations, normative parameters, maintenance schedules, fuel and variable cost, working capital, fuel-cost workings, non-tariff income, tariff schedules, revenue from sale of power, income tax and hydel generation, ending with coal and oil GCV computations (pp1, 20, 23, 36–37).
Pages 2–19 are the financial formats — ARR, operating expense heads, assets and depreciation, financing and prior-period items — each laid out as previous-year actuals, current-year estimates and the three years of the control period, with station-wise and consolidated columns (pp2–19). Pages 19–27 turn to technical and cost parameters: generation cost summary, thermal plant characteristics, hydro project features and month-wise design energy and peaking, normative parameters for thermal and hydro tariff computation, maintenance schedule and generation/fuel/variable cost (pp19–27). Pages 27–35 cover working capital, fuel-linked energy charge workings, non-tariff income, tariff schedules and revenue, income tax and hydel availability including BBMB shares (pp27–35). The last two forms compute weighted average GCV of coal and of oil (pp36–37).
Standing instructions at p1 require the formats in Excel and the petition in Word, unit-wise filing for every generating station, and expressly allow the Commission to amend the formats or add new ones; the notes to individual forms repeat that station-wise and consolidated submissions are required, and that some data must also be given for the three years preceding the control period (p26).
Read with this
The regulation
Amendments and corrections
Procedures and orders made under it
- Date not statedFormats - Distribution (Form D1–D34)
- Date not statedTransmission and SLDC ARR and Tariff Petition Formats
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.