Short Term Green Energy Open Access (ST-GEOA) Implementation Procedure

GUIDELINES/PROCEDURE FOR IMPLEMENTATION OF SHORT TERM GREEN ENERGY OPEN ACCESS (ST-GEOA)

ProcedureDate not stated

Made under the Green Energy Open Access Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software, from pages 1 to 36 of 43. Check the regulator's original before you rely on it.

This is the Delhi Commission's implementing procedure for short-term green energy open access (ST-GEOA), issued under sub-regulation (m) of Regulation 10 of the DERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 (p2). It applies to all short-term open access applications on the intra-state network, with Delhi SLDC as State Nodal Agency and the concerned distribution licensee acting as nodal agency where injection and drawal fall in the same licensee's area (p2).

Paras 2–4 set who may apply and how they connect: consumers of 100 kW or more at 11 kV and above (single or aggregated connections under one name), plus renewable generators, with carve-outs for captive plants and a bar on insolvent or dues-defaulting applicants (p2–3); connectivity and ABT/special energy metering, check meters, testing, sealing, calibration and real-time communication, including 24-hour control rooms for large consumers (p3–4).

Paras 5–13 lay out the process: SLDC registration and formats, application format, a non-refundable processing fee, the document and undertaking set, an 11-month-or-less consent period, distribution licensee consent timelines, SLDC conditional consent, the letter of credit/bank guarantee payment-security mechanism, metering installation timelines, standing clearance and transaction applications (including day-ahead GEOA), congestion bidding, scheduling on advance, first-come-first-served and day-ahead bases, and revision, cancellation and renewal of schedules and consent (p4–13).

Paras 14–24 deal with operation and money: treatment of evacuation failure, meter reading and energy accounting, faulty metering, charges, energy losses, billing, due date, late payment surcharge, default and disconnection, collection and disbursement, and curtailment priority (green energy curtailed after non-green, distribution licensees last) (p13–17).

Pages 18–19 give metering installation guidelines split between consumer and DISCOM/STU duties, and pages 20–36 contain the prescribed formats — application, acknowledgement, approval, schedule of payments, bidding invitation and bid, distribution licensee consent, conditional consent letter, consumer undertaking, and SLDC registration formats for generators and open access consumers.

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access, Open access charges

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document