Skip to content

DERC · Delhi Electricity Regulatory Commission

Terms and Conditions for Green Energy Open Access (First Amendment) Regulations, 2026

Delhi Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2026

Amendment · Gazette copyDated 17 Jun 2026F. NO. 17(17)/Engg./DERC/2023-24/8020/579 dated 17th June, 2026

The Gazette copy of the Terms and Conditions for Green Energy Open Access (First Amendment) Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Delhi Electricity Regulatory Commission's first amendment to its 2024 Green Energy Open Access Regulations, issued as a Gazette notification dated 17 June 2026 and extending to the whole of the National Capital Territory of Delhi (p3). Its single purpose is to remove the 11 kV voltage floor from the eligibility test for green energy open access and to leave capacity alone as the qualifying criterion.

Clause 1 sets the short title, gives the amendment force from the date of Gazette publication, and states its territorial extent (p3). Clauses 2 and 3 rewrite the definitions of "Entity" in Regulation 2(l) and of "Green Energy Open Access Consumer" in Regulation 2(p) of the Principal Regulations, deleting the words "connected at 11kV or above" and substituting full replacement definitions built on a contracted demand or sanctioned load of 100 kW or more, whether through a single connection or through multiple connections aggregating to that level within the area of supply of the same distribution licensee (p3). Each replacement definition carries a proviso that there is no load limitation on setting up green energy projects for captive use (p3).

Clause 4 makes the identical change to the eligibility clause in Regulation 8(a), restating who may take open access for green energy sourcing and again preserving an unrestricted position for consumers with captive generating plants (p4). A closing note records the publication particulars of the Principal Regulations (p4). The amendment therefore widens the pool of consumers who can seek green energy open access, but does not itself touch wheeling, banking, charges or procedural mechanics.

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access

Read with this

The regulation

Procedures and orders made under it

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.