Skip to content

DERC · Delhi Electricity Regulatory Commission

Green Energy Open Access (First Amendment) Regulations, 2026 — Draft

Delhi Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2026

Draft amendmentDated 15 Apr 2026F.17(17)/Engg./DERC/2023-24/8020 dated 15/04/2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page draft amendment notification from the Delhi Electricity Regulatory Commission that would rewrite the eligibility test for green energy open access in Delhi. It amends the DERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024, and would take effect from the date of publication in the Official Gazette, extending to the whole of NCT of Delhi (p1).

The substantive change is structural rather than numeric: the phrase "connected at 11kV or above" is struck out of three places, so that eligibility turns solely on load/demand rather than on the voltage at which a consumer is connected. Clause 2 replaces the definition of "Entity" in Regulation 2(l) — a consumer with contracted demand or sanctioned load of 100 kW or more, through a single connection or through multiple connections aggregating to that level, within the same distribution licensee's area of supply, excluding captive consumers (p1). Clause 3 does the same for the definition of "Green Energy Open Access Consumer" in Regulation 2(p), covering persons supplied green energy by a licensee, the Government, their own captive plant or any other authorised supplier (p1–2).

A second clause numbered 3.0 amends Regulation 8(a), restating the open-access eligibility criterion in load terms (p2). Each of the three amendments carries an identical proviso: no load limitation applies to captive consumers setting up green energy projects for captive use, whatever their contract demand or sanctioned load with the distribution companies. The draft is signed by the Joint Director (PS & E) and dated 15/04/2026, with a closing note recording that the Principal Regulations were published on 12 November 2024 as Delhi Gazette Extraordinary, Part III, N.C.T.D. No. 247 (p2).

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (1)

Earlier drafts

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document