DERC · Delhi Electricity Regulatory Commission
Green Energy Open Access (First Amendment) Regulations, 2026 — Draft
Delhi Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2026
Draft amendmentDated 15 Apr 2026F.17(17)/Engg./DERC/2023-24/8020 dated 15/04/2026
Draft
A proposal that has since been finalised as the Terms and Conditions for Green Energy Open Access (First Amendment) Regulations, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page draft amendment notification from the Delhi Electricity Regulatory Commission that would rewrite the eligibility test for green energy open access in Delhi. It amends the DERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024, and would take effect from the date of publication in the Official Gazette, extending to the whole of NCT of Delhi (p1).
The substantive change is structural rather than numeric: the phrase "connected at 11kV or above" is struck out of three places, so that eligibility turns solely on load/demand rather than on the voltage at which a consumer is connected. Clause 2 replaces the definition of "Entity" in Regulation 2(l) — a consumer with contracted demand or sanctioned load of 100 kW or more, through a single connection or through multiple connections aggregating to that level, within the same distribution licensee's area of supply, excluding captive consumers (p1). Clause 3 does the same for the definition of "Green Energy Open Access Consumer" in Regulation 2(p), covering persons supplied green energy by a licensee, the Government, their own captive plant or any other authorised supplier (p1–2).
A second clause numbered 3.0 amends Regulation 8(a), restating the open-access eligibility criterion in load terms (p2). Each of the three amendments carries an identical proviso: no load limitation applies to captive consumers setting up green energy projects for captive use, whatever their contract demand or sanctioned load with the distribution companies. The draft is signed by the Joint Director (PS & E) and dated 15/04/2026, with a closing note recording that the Principal Regulations were published on 12 November 2024 as Delhi Gazette Extraordinary, Part III, N.C.T.D. No. 247 (p2).
Read with this
The regulation
- Dated 7 Oct 2024Green Energy Open Access Regulations, 2024
Amendments and corrections
Procedures and orders made under it
Other copies of these documents (1)
Earlier drafts
- Dated 15 Apr 2026Public notice: Green Energy Open Access (First Amendment) Regulations, 2026 — Public Notice Inviting Comments
- Released with the notice dated 15 Apr 2026Explanatory memorandum: Green Energy Open Access (First Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.