DERC · Delhi Electricity Regulatory Commission
Green Energy Open Access Regulations, 2024
Delhi Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) Regulations, 2024
RegulationDated 7 Oct 2024F.17(17)/Engg./DERC/2023-24/8020 dated 07th Oct 2024
1 amendment to it is on Voltaic, dated 17 Jun 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Delhi Electricity Regulatory Commission issued these Regulations on 7 October 2024 (p1) to govern green energy open access in the National Capital Territory of Delhi. They are made under s.181 read with ss.42, 61(h), 66 and 86(1)(e) of the Electricity Act, 2003 (p1) and give effect to the Ministry of Power's Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2022, which are folded into the defined term "Rules" (p3).
Regulations 1–3 set out title, extent and commencement — commencement is tied to gazette publication, though the gazette date is not printed — and a definitions clause that fixes the vocabulary for the rest of the document: green energy (including storage using renewable energy, and green hydrogen/ammonia), captive generating plant, banking, wheeling, standby arrangement, and the split of the State Nodal Agency role between SLDC, STU and the distribution licensee (p1–4). Regulation 4 defines scope: open access to green energy and to non-fossil municipal solid-waste-to-energy/RDF plants over the intra-state transmission and/or distribution system (p4–5).
Regulation 5 lays down the criteria for allowing access, including system-margin and metering preconditions and a no-dues requirement; Regulation 6 splits open access into long-term, medium-term and short-term by duration (p5). Regulations 7 and 8 set the application route through the Central Nodal Agency and the eligibility threshold — consumers with contract demand or sanctioned load of 100 kW or more, connected at 11kV or above, with no load limit for captive use — plus the requirement not to vary quantum for a minimum number of time blocks (p5–7). Regulation 9 fixes allotment priority, giving distribution licensees first claim and green energy consumers priority over ordinary open access (p7).
Regulation 10 is the operational core: the processing timeline from T0 to agreement execution, the processing fee schedule, bank guarantees for long/medium-term applicants, the commissioning deadline with deemed cancellation, and an obligation on the nodal agency and DISCOMs to get open access procedures approved by the Commission within 90 days (p7–12). Regulation 11 covers day-ahead transactions and Regulation 12 relinquishment of rights (p12–13).
Regulation 13, the longest part, enumerates the charge heads — transmission, wheeling, cross-subsidy surcharge, additional surcharge, standby, banking, and other fees — and its sub-clauses supply the exemptions (captive plants, RDF/MSW plants, green hydrogen and ammonia, RPO-linked quantum) while deferring rate levels to tariff orders and, for ISTS-linked banking, to CERC Regulations (p13–19). Regulations 14–17 cover curtailment priority, metering, grid code compliance and collection/disbursement; the closing regulations deal with SLDC information posting, quarterly reports, dispute resolution with appeal to the Commission, powers to issue directions, relaxation and amendment, and repeal with saving of existing open access arrangements (p20–22).
Read with this
Amendments and corrections
Procedures and orders made under it
Other copies of these documents (1)
Earlier drafts
- Dated 15 Apr 2026Green Energy Open Access (First Amendment) Regulations, 2026 — Draft
- Dated 15 Apr 2026Public notice: Green Energy Open Access (First Amendment) Regulations, 2026 — Public Notice Inviting Comments
- Released with the notice dated 15 Apr 2026Explanatory memorandum: Green Energy Open Access (First Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of DERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.