CERC · Central Electricity Regulatory Commission
Ancillary Services Regulations, 2021 — Explanatory Memorandum — Draft
Draft Central Electricity Regulatory Commission (Ancillary Services) Regulations, 2021
Explanatory memorandum to a draftReleased with the draft dated 29 May 2021
Draft
The draft has since been finalised as the Ancillary Services Regulations, 2022.
Explanatory memorandum to the Ancillary Services Regulations, 2021 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's explanatory memorandum for the draft Central Electricity Regulatory Commission (Ancillary Services) Regulations, 2021, placed for public consultation (pp1, 7). It explains why the Commission wants to replace the 2015 RRAS framework and how it proposes to procure and settle secondary and tertiary reserves. It is not the draft regulation text; it describes the policy choices, with detailed clauses and appendices left to the draft regulations.
Section 1 (pp2–7) sets out the reliability problem: primary, secondary and tertiary frequency control, the National Electricity Policy reserve margin, the limits of the existing RRAS mechanism, AGC pilots, and the need for fast response reserves with growing intermittent renewables. Section 2 (pp7–8) summarises the proposed design: NLDC estimates reserve needs; SRAS starts as an administered service with an enabling provision for market-based procurement; TRAS is market-based; participation is widened to inter-State/intra-State connected generation, energy storage and demand-side resources.
Section 3 (pp8–9) requires the Nodal Agency (NLDC) to estimate SRAS and TRAS requirements, using Grid Code methodology when available and a Detailed Procedure in the interim, reassessed day-ahead and in real time. Section 4 (pp9–15) covers SRAS eligibility, activation, procurement, selection through a Custom Participation Factor, despatch by 4-second signals, payment and performance incentives. Section 5 (pp15–20) covers TRAS eligibility, activation to replenish secondary reserves, procurement through power exchanges in DAM and RTM, price discovery, scheduling/despatch, and payment including commitment charge. Section 6 (pp20–21) handles shortfall and emergency conditions. Section 7 (pp21–23) covers weekly RPC accounting and settlement through the Deviation and Ancillary Service Pool Account. Section 8 (p23) waives transmission charges/losses for SRAS/TRAS. Section 9 (p23) requires a Detailed Procedure within three months of notification. Section 10 (p23) repeals the RRAS Regulations 2015 with savings.
Read with this
The regulation
- Dated 31 Jan 2022Ancillary Services Regulations, 2022
Commencement notices and reasons
- Dated 26 Apr 2022Ancillary Services Regulations, 2022 — Statement of Reasons
- Dated 31 Oct 2022Ancillary Services Regulations, 2022 — Commencement Notification
- Dated 31 Oct 2022Ancillary Services Regulations, 2022 — Commencement Notification, effective 05.12.2022
- Dated 15 Feb 2023Gazette, effective date 01.04.2023
- Dated 15 Feb 2023Ancillary Services Regulations, 2022 — Commencement Notification, effective 01.04.2023
- Dated 27 Mar 2023Ancillary Services Regulations, 2022 — Commencement Notification, 2023
- Dated 27 Mar 2023Ancillary Services Regulations, 2022 — Commencement Notification (01.05.2023)
- Dated 28 Apr 2023Ancillary Services Regulations, 2022 — Commencement Notification, 01.06.2023
- Dated 28 Apr 2023Ancillary Services Regulations, 2022 — commencement notification, 01.06.2023
Other copies of these documents (1)
- Dated 31 Jan 2022Ancillary Services Regulations, 2022
Earlier drafts
- Dated 29 May 2021Ancillary Services Regulations, 2021 — Draft
- Dated 30 Jun 2021Notice extending the date for comments: Extension of Comments Deadline on Draft Ancillary Services Regulations, 2021
- Dated 28 Jul 2021Hearing notice: Public hearing notice on Draft Ancillary Services Regulations, 2021 — hearing 11.08.2021
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.