Skip to content

CERC · Central Electricity Regulatory Commission

Ancillary Services Regulations, 2021 — Explanatory Memorandum — Draft

Draft Central Electricity Regulatory Commission (Ancillary Services) Regulations, 2021

Explanatory memorandum to a draftReleased with the draft dated 29 May 2021

Draft

The draft has since been finalised as the Ancillary Services Regulations, 2022.

Explanatory memorandum to the Ancillary Services Regulations, 2021 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum for the draft Central Electricity Regulatory Commission (Ancillary Services) Regulations, 2021, placed for public consultation (pp1, 7). It explains why the Commission wants to replace the 2015 RRAS framework and how it proposes to procure and settle secondary and tertiary reserves. It is not the draft regulation text; it describes the policy choices, with detailed clauses and appendices left to the draft regulations.

Section 1 (pp2–7) sets out the reliability problem: primary, secondary and tertiary frequency control, the National Electricity Policy reserve margin, the limits of the existing RRAS mechanism, AGC pilots, and the need for fast response reserves with growing intermittent renewables. Section 2 (pp7–8) summarises the proposed design: NLDC estimates reserve needs; SRAS starts as an administered service with an enabling provision for market-based procurement; TRAS is market-based; participation is widened to inter-State/intra-State connected generation, energy storage and demand-side resources.

Section 3 (pp8–9) requires the Nodal Agency (NLDC) to estimate SRAS and TRAS requirements, using Grid Code methodology when available and a Detailed Procedure in the interim, reassessed day-ahead and in real time. Section 4 (pp9–15) covers SRAS eligibility, activation, procurement, selection through a Custom Participation Factor, despatch by 4-second signals, payment and performance incentives. Section 5 (pp15–20) covers TRAS eligibility, activation to replenish secondary reserves, procurement through power exchanges in DAM and RTM, price discovery, scheduling/despatch, and payment including commitment charge. Section 6 (pp20–21) handles shortfall and emergency conditions. Section 7 (pp21–23) covers weekly RPC accounting and settlement through the Deviation and Ancillary Service Pool Account. Section 8 (p23) waives transmission charges/losses for SRAS/TRAS. Section 9 (p23) requires a Detailed Procedure within three months of notification. Section 10 (p23) repeals the RRAS Regulations 2015 with savings.

Standard name
Ancillary Services Regulations
Primary topics
Ancillary services and reserves, Power markets and exchanges, Energy accounting and settlement

Read with this

The regulation

Other copies of these documents (1)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document