CERC · Central Electricity Regulatory Commission
Ancillary Services Regulations, 2022
Central Electricity Regulatory Commission (Ancillary Services) Regulations, 2022
Regulation · Gazette copyDated 31 Jan 2022Published in the Gazette 12 Feb 2022No. RA-14026(11)/3/2019-CERC dated 31st January, 2022
The Gazette copy of the Ancillary Services Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are CERC's principal regulations for procuring, deploying and paying for ancillary services to keep grid frequency close to 50 Hz, restore it within the Grid Code band, and relieve transmission congestion. They were issued on 31 January 2022 and gazetted on 12 February 2022 (p12, p1), and they replace the 2015 Ancillary Services Operations Regulations from the date the new regulations commence (p23). Commencement is deferred: the regulations come into force on a date to be notified by the Commission (p13).
The general provisions define ancillary services and key institutions, make the National Load Despatch Centre the Nodal Agency acting through RLDCs, and require reserve estimation for SRAS and TRAS in coordination with RLDCs and SLDCs (p13–15). Part I (p15–18) covers Secondary Reserve Ancillary Service: eligibility, activation by Area Control Error, regional procurement, selection through a Custom Participation Factor, despatch via automatic secondary control signals, payment from the Deviation and Ancillary Service Pool Account, performance measurement, incentives and disqualification. Part II (p18–20) covers Tertiary Reserve Ancillary Service: eligibility, activation, procurement through Day Ahead and Real Time AS markets on power exchanges, price discovery, scheduling and despatch, and payment including commitment charges. Part III (p21) provides fallback despatch of Section 62 generating stations, including their un-requisitioned surplus, during shortfall or emergency conditions. Part IV (p21–22) deals with accounting and settlement by Regional Power Committees and the pool account, and exempts SRAS/TRAS from transmission charges and losses. Part V (p22–23) requires the Nodal Agency to issue a Detailed Procedure and gives the Commission powers to relax, issue directions, remove difficulties, and repeal/save the 2015 regulations.
Read with this
The regulation
- Dated 31 Jan 2022Ancillary Services Regulations, 2022
Commencement notices and reasons
- Dated 26 Apr 2022Ancillary Services Regulations, 2022 — Statement of Reasons
- Dated 31 Oct 2022Ancillary Services Regulations, 2022 — Commencement Notification
- Dated 31 Oct 2022Ancillary Services Regulations, 2022 — Commencement Notification, effective 05.12.2022
- Dated 15 Feb 2023Gazette, effective date 01.04.2023
- Dated 15 Feb 2023Ancillary Services Regulations, 2022 — Commencement Notification, effective 01.04.2023
- Dated 27 Mar 2023Ancillary Services Regulations, 2022 — Commencement Notification, 2023
- Dated 27 Mar 2023Ancillary Services Regulations, 2022 — Commencement Notification (01.05.2023)
- Dated 28 Apr 2023Ancillary Services Regulations, 2022 — Commencement Notification, 01.06.2023
- Dated 28 Apr 2023Ancillary Services Regulations, 2022 — commencement notification, 01.06.2023
Earlier drafts
- Dated 29 May 2021Ancillary Services Regulations, 2021 — Draft
- Released with the draft dated 29 May 2021Explanatory memorandum: Ancillary Services Regulations, 2021 — Explanatory Memorandum — Draft
- Dated 30 Jun 2021Notice extending the date for comments: Extension of Comments Deadline on Draft Ancillary Services Regulations, 2021
- Dated 28 Jul 2021Hearing notice: Public hearing notice on Draft Ancillary Services Regulations, 2021 — hearing 11.08.2021
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.