Skip to content

CERC · Central Electricity Regulatory Commission

Ancillary Services Regulations, 2022

Central Electricity Regulatory Commission (Ancillary Services) Regulations, 2022

RegulationDated 31 Jan 2022RA-14026(11)/3/2019-CERC dated 31st January, 2022

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC's principal framework for procuring, deploying and paying for ancillary services on the inter-State grid, notified 31 January 2022 (p1). It is made under s.178 read with s.79(1)(h) and (i) of the Electricity Act, and repeals the 2015 Ancillary Services Operations Regulations from the date it comes into force — a date the Commission is yet to notify (p1, p22).

Regulations 1–6 set the objective (holding frequency close to 50 Hz and relieving transmission congestion), define the vocabulary of reserves and control modes, and scope the instrument to regional entities — generating stations, energy storage resources and demand-response providers, standalone or aggregated (p4–5). The Nodal Agency (NLDC), with RLDCs and SLDCs, must estimate SRAS and TRAS requirements regionally, reassess them day-ahead and in real time, and publish them; until the Grid Code speaks, an interim methodology is to be put to the Commission for approval within two months (p6).

Part I (Regs 7–13, p6–13) covers SRAS: eligibility and technical qualification, activation via Area Control Error, the ACE formula and the three control modes, administered regional procurement, a Custom Participation Factor for selecting and despatching providers, four-second control signals, payment through the Deviation and Ancillary Service Pool Account, and a performance-linked incentive and disqualification regime.

Part II (Regs 14–19, p13–17) covers TRAS bought through Day Ahead and Real Time Ancillary Service Markets run by power exchanges: bidding and non-overlap rules, price discovery (uniform clearing for TRAS-Up, pay-as-bid for TRAS-Down), despatch on pro-rata or bid order when the requirement falls short of what was cleared, and payment including commitment charges for capacity cleared but not despatched.

Part III (Reg 20, p17–18) provides for shortfall in market procurement and emergency conditions; Part IV (Regs 21–22, p18–20) sets weekly accounting by Regional Power Committees, settlement through DSM charges and the pool account, and exemption from transmission charges and losses. Part V (Regs 23–26, p20–22) requires the Nodal Agency's Detailed Procedure within three months and gives the Commission powers to relax provisions, issue directions and remove difficulties.

Standard name
Ancillary Services Regulations
Primary topics
Ancillary services and reserves, Power markets and exchanges, Scheduling and despatch

Read with this

Other copies of these documents (1)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document