CERC · Central Electricity Regulatory Commission

Ancillary Services Regulations, 2022 — Statement of Reasons

Central Electricity Regulatory Commission (Ancillary Services) Regulations, 2022 – Statement of Objects & Reasons (SOR) thereof

Statement of reasonsDated 26 Apr 2022

The commission's reasons for the Ancillary Services Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 26 of 59. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's Statement of Reasons for the CERC (Ancillary Services) Regulations, 2022, dated 26 April 2022 (p1). It is not the regulation itself: it records the public consultation on the draft, summarises stakeholder comments, and gives the Commission's analysis and decisions clause by clause. The introduction sets out the process: draft Regulations issued on 30 May 2021, Explanatory Memorandum on 16 June 2021, comments due 30 June 2021 and extended to 15 July 2021, 50 stakeholder submissions, and a public hearing on 11 August 2021 (p1–2). The final Regulations were notified on 31 January 2022, but the Commission says commencement will be notified separately (p2).

The first chapter deals with definitions (p2–7). The Commission retains definitions of AGC signal, ancillary service, energy storage, Nodal Agency and URS, and modifies compensation charge to cover providers other than generating stations whose tariff is determined under Section 62, and demand response to include standalone or aggregated participation (p3–5). It leaves many operational details—aggregators, EV, storage and demand-side participation—to the Nodal Agency's Detailed Procedure (p5–7).

The scope chapter confirms that the Regulations apply to regional entities, including entities with energy storage and demand-side resources qualified to provide ancillary services; access and storage owned by transmission licensees are outside the AS Regulations (p7–8). The types chapter keeps PRAS, SRAS, TRAS and other Grid Code services, with SRAS and TRAS under these Regulations and an enabling route for PRAS later (p8–9).

Reserve estimation is covered at p9–12: the Nodal Agency, with RLDCs and SLDCs, estimates SRAS and TRAS requirements, reassesses them day-ahead and in real time, and must publish the quantum. Until the Grid Code specifies methodology, the Nodal Agency is to propose an interim methodology within two months (p9–12).

Part 1 begins the SRAS provisions. Eligibility (p12–17) is open to generating stations and entities with energy storage or demand-side resources connected to inter-State or intra-State transmission, subject to communication, AGC, metering/SCADA, a minimum response threshold and response times; technical criteria are left to the Detailed Procedure. Activation and deployment (p17–19) use regional Area Control Error beyond a dead band, an ACE formula and frequency-bias inputs, and can correct ACE or replenish primary reserves. Procurement (p19–23) is initially administrative and regional, with standing consent, declaration of technical and commercial parameters, withdrawal notice subject to forced-outage exception, and no commitment charge at first. Selection and despatch (p24–26) use a Custom Participation Factor based on ramping capability and cost, four-second signals, and SCADA-based measurement for incentives and payments.

Standard name
Ancillary Services Regulations
Primary topics
Ancillary services and reserves, Scheduling and despatch, Energy accounting and settlement

Read with this

The regulation

Other copies of these documents (1)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document