CERC · Central Electricity Regulatory Commission
Ancillary Services Regulations, 2021 — Draft
Central Electricity Regulatory Commission (Ancillary Services) Regulations, 2021
Draft regulationDated 29 May 2021No. RA-14026(11)/3/2019-CERC dated 29 th May, 2021
Draft
A proposal that has since been finalised as the Ancillary Services Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
These draft regulations, issued by CERC on 29 May 2021, create the framework for procuring, deploying and paying for ancillary services in India's inter-State grid (p1). The objective is to keep grid frequency close to 50 Hz, restore it within the Grid Code band, and relieve transmission congestion (p1). They apply to regional entities connected to inter-State or intra-State transmission, including generating stations, energy storage resources and demand-side resources (p5).
Regulations 1–6 set commencement on a date to be notified, define core terms, list the ancillary service types (PRAS, SRAS, TRAS and others in the Grid Code), and require the Nodal Agency (NLDC), with RLDCs and SLDCs, to estimate SRAS/TRAS requirements day-ahead and in real time (p1, p5–6).
Part I (Regulations 7–13) covers SRAS: eligibility, including a minimum response of 1 MW, AGC and communication requirements; ACE-based activation; procurement through standing consent and declared charges; selection and signal allocation via a Custom Participation Factor; despatch through 4-second secondary control signals; payment from the Deviation and Ancillary Service Pool Account; performance-linked incentives; and disqualification for persistent under-performance (p6–11).
Part II (Regulations 14–19) covers TRAS: eligibility and response timings; activation to replenish secondary reserves; procurement through power exchanges in the Day Ahead and Real Time Markets; price discovery (uniform clearing for TRAS-Up, pay-as-bid for TRAS-Down); despatch rules; and payment, including a commitment charge for cleared but undispatched TRAS-Up (p11–15).
Part III (Regulation 20) deems un-requisitioned surplus of Section 62 generating stations available for SRAS/TRAS during shortfall or emergency, with compensation rules (p15–16). Part IV (Regulations 21–22) provides weekly accounting by Regional Power Committees, pool-account charges and credits, settlement through DSM charges, and exemption from transmission charges and losses for ancillary services (p16–17). Part V (Regulations 23–26) requires a Detailed Procedure within three months, grants power to relax and issue directions, and repeals the 2015 Ancillary Services Operations Regulations with savings (p17–19). Appendices I and II give the Custom Participation Factor methodology and the SRAS performance measurement and incentive calculation (p20–24).
Read with this
The regulation
- Dated 31 Jan 2022Ancillary Services Regulations, 2022
Commencement notices and reasons
- Dated 26 Apr 2022Ancillary Services Regulations, 2022 — Statement of Reasons
- Dated 31 Oct 2022Ancillary Services Regulations, 2022 — Commencement Notification
- Dated 31 Oct 2022Ancillary Services Regulations, 2022 — Commencement Notification, effective 05.12.2022
- Dated 15 Feb 2023Gazette, effective date 01.04.2023
- Dated 15 Feb 2023Ancillary Services Regulations, 2022 — Commencement Notification, effective 01.04.2023
- Dated 27 Mar 2023Ancillary Services Regulations, 2022 — Commencement Notification, 2023
- Dated 27 Mar 2023Ancillary Services Regulations, 2022 — Commencement Notification (01.05.2023)
- Dated 28 Apr 2023Ancillary Services Regulations, 2022 — Commencement Notification, 01.06.2023
- Dated 28 Apr 2023Ancillary Services Regulations, 2022 — commencement notification, 01.06.2023
Other copies of these documents (1)
- Dated 31 Jan 2022Ancillary Services Regulations, 2022
Earlier drafts
- Released with the draft dated 29 May 2021Explanatory memorandum: Ancillary Services Regulations, 2021 — Explanatory Memorandum — Draft
- Dated 30 Jun 2021Notice extending the date for comments: Extension of Comments Deadline on Draft Ancillary Services Regulations, 2021
- Dated 28 Jul 2021Hearing notice: Public hearing notice on Draft Ancillary Services Regulations, 2021 — hearing 11.08.2021
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.