Skip to content

HERC · Haryana Electricity Regulatory Commission

Duty to Supply Electricity on Request and Power to Recover Expenditure Regulations, 2016 — 3rd Amendment, 2023

Haryana Electricity Regulatory Commission (Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security) Regulations, 2016 (3rd Amendment) Regulations, 2023

AmendmentDated 27 Sep 2023HERC /34 /2016/3rd Amendment/2023 dated The 27th September, 2023

Amends the Duty to Supply Electricity on Request, Recovery of Expenditure and Security Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the third amendment to HERC's 2016 Duty to Supply Electricity on Request regulations, notified on 27 September 2023 as Regulation No. HERC/34/2016/3rd Amendment/2023 (p1). It inserts a new clause 4.17 into the parent regulations governing how Haryana's distribution licensees charge large builder/developer colonies for the external electrical infrastructure built to serve them, and what those developers must hand over in return.

It applies to the whole state with one carve-out: the pilot project in new Sectors 58–115 and Sectors 37C & 37D of Gurugram, the new sectors of Faridabad, and the area on the left side of the Delhi–Jaipur highway in Dharuhera are excluded (p1). The amendment comes into force from Gazette publication, but the Gazette date is not printed.

The heart of the instrument is EESDC — External Electrical System Development Charges — levied on a project's 'ultimate load' at 33 kV and above, in lieu of the developer building its own substation, line or bay (p1–2). Clause 4.17.1 sets out the calculation basis: standard substation configurations per voltage level, standard double-circuit line lengths, bays at the feeding substation, and exclusion of land cost because land is the developer's contribution. Table-A gives per-MVA rates banded by load size and voltage level (p2). The rates hold for two years from notification and are then revisable with the Commission's prior approval. Internal distribution up to 11 kV stays with the developer and is taken over by the licensee on completion (p2–3).

Clause 4.17.2 lays out the recovery workflow: licence application routed through DGTCP, DISCOM approval of the electrification plan within 30 days (deemed approval if not), 50% of EESDC before grant of licence and the balance in stages tied to substation voltage, with deemed NOC and an online DISCOM portal (p3–4). Clause 4.17.3 and Table-B specify the free land and right of way the developer must provide per voltage level, with a 1.5-times EESDC penalty where AIS land cannot be given (p4–5).

The remaining sub-clauses cover grouping of contiguous projects (4.17.4), the licensee's duty to plan infrastructure and release connections without delay (4.17.5), the bar on releasing connections before land handover and the limited use of temporary connections (4.17.6), the bar on further service connection charges where EESDC is paid (4.17.7), phasing and bank-guarantee relaxations for government agencies (4.17.8), smart-meter and AMR requirements (4.17.9), deposit with the distribution licensee and transmission cost recovery through ARR (4.17.10), and the position of non-builder/developer consumers (4.17.11–4.17.12) (p5–6).

Standard name
Recovery of Expenditure and Miscellaneous Charges, Duty to Supply on Request
Primary topics
Connection and miscellaneous charges, Supply to buildings and colonies, Network planning and investment

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document