Duty to Supply Electricity on Request, Recovery of Expenditure and Security Regulations, 2016
The Haryana Electricity Regulatory Commission (Duty to supply electricity on request, Power to recover expenditure incurred in providing supply and Power to require security) Regulations, 2016
RegulationDated 11 Jul 2016Regulation No. HERC/34/2016 dated 11th July, 2016
4 amendments to it are on Voltaic, the latest dated 22 Jul 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Haryana Electricity Regulatory Commission issued these Regulations by notification dated 11 July 2016 under Regulation No. HERC/34/2016, using powers in s.181(2)(t),(v),(w) read with ss.43, 46 and 47 of the Electricity Act, 2003 (p1). The Statement of Objects and Reasons (pp1–2) explains that the 2005 Regulations had been amended twice and had to be aligned with the Electricity (Amendment) Act 2007, CEA metering and safety regulations, and the new Electricity Supply Code of 2014; a draft was published on 2 May 2016, comments were sought, and a public hearing was held on 30 May 2016. The operative Regulations come into force from the date of publication in the Haryana Gazette, but the Gazette date is not printed (p2). They extend to the whole State of Haryana and apply to all distribution and retail supply licensees, including entities exempt under s.13, and to all consumers/persons in Haryana (pp2–3).
Regulation 2 sets definitions and interpretation rules, adopting Electricity Act definitions and residual Haryana Electricity Reform Act 1997 meanings (pp3–7). Regulation 3 imposes the duty to supply on request within the Electricity Supply Code timeframe if technically feasible and after complete application; it covers voltage/load categories, HT above 33 kV arrangements, unelectrified areas, application processing fees, one connection one premises, single-point supply for employers' colonies and Group Housing Societies (including loss-tolerance and pre-payment meter carve-out), self-execution by applicants, and independent feeder feasibility, including a minimum load threshold and essential-services exception (pp7–12).
Regulation 4 allows the licensee to recover service connection charges or actual expenditure, requires publication of charges, distinguishes licensee-funded system strengthening through ARR from consumer-funded extension/upgradation, sets demand-notice and independent-feeder billing rules, requires an annual Standard Cost Data Book approved by the Commission, provides for refunds/interest and accounting treatment (pp12–19). Regulation 5 governs security for supply, advance consumption deposit, meter security/rental, interest and annual review (pp19–23). Regulation 6 covers consequences of default, including penalties by reference to the Standards of Performance Regulations, cancellation and forfeiture (p23). Regulation 7 routes grievances to CGRF and Ombudsman (pp23–24). Regulations 8–12 deal with directions, removal of difficulties, relaxation, amendment and repeal of the 2005 Regulations (p24). Annexure I specifies the methodology and category rates for service connection charges and extension costs (pp25–27).
Read with this
Amendments and corrections
- Dated 19 Mar 2020Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations 2016 — 1st Amendment, 2020
- Dated 27 Sep 2023Duty to Supply Electricity on Request and Power to Recover Expenditure Regulations, 2016 — 3rd Amendment, 2023
- Dated 27 Sep 2023Duty to Supply Electricity on Request, Power to Recover Expenditure and Power to Require Security Regulations, 2016 — 2nd Amendment, 2023
- Dated 22 Jul 2026Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations, 2016 — 4th Amendment, 2026
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.