HERC · Haryana Electricity Regulatory Commission
Duty to Supply Electricity on Request, Power to Recover Expenditure and Power to Require Security Regulations, 2016 — 2nd Amendment, 2023
Haryana Electricity Regulatory Commission (Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security) Regulations, 2016 (2nd Amendment) Regulations, 2023
AmendmentDated 27 Sep 2023HERC /34 /2016/2nd Amendment/2023 dated The 27th September, 2023
Amends the Duty to Supply Electricity on Request, Recovery of Expenditure and Security Regulations, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the second amendment to HERC's 2016 Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations, issued by the Commission on 27 September 2023 under s.181(2)(t) and (v) read with ss.43, 46 and 47 of the Electricity Act 2003 (p1). It inserts a single new clause 4.16 into Regulation 4 (Power to Recover Expenditure), and clause 1.2 confines its operation to a defined pilot belt — new Sectors 58–115 and Sector 37-C & 37-D of Gurugram, new sectors of Faridabad, and the left side of the Delhi–Jaipur highway in Dharuhera (p1). It takes effect from Gazette publication, which is not printed.
Clause 4.16 creates a distinct supply architecture for that belt. Connections are to be released on a 220/33/0.4 kV configuration (p1–2); the builder/developer builds the internal electrical infrastructure at its own cost, while the licensee builds the external infrastructure against an External Electrical System Development Charge (p2). Clause 4.16.4 gives the formula for that charge, fixes the rate at Rs.31 lakh per MVA (p3), and makes the rate valid for two years, after which it is revisable on cost data with the Commission's prior approval (p3).
4.16.5 sets out the recovery workflow through the town and country planning authority and the DISCOM: approval of the electrification plan, deemed approval on inaction, part payment before licence and the balance before occupation or permanent connection, with online processing (p3–4). 4.16.6 requires multi-point connections and takeover of the developer's internal network by the licensee (p4–5). 4.16.7 requires smart and remotely read meters (p5). 4.16.8 governs land for switching stations and grouping of smaller developers; 4.16.9 makes 11 kV-to-33 kV upgrading a licensee cost in ARR, with protection for work already started before this amendment (p5–6). 4.16.10 scales substation and land obligations to load size (p6), 4.16.11 covers non-builder consumers (p6–7), and 4.16.12 requires DT inventory (p7). 4.16.14 provides that all applicable regulations stand amended to this extent (p7).
Read with this
The regulation
Amendments and corrections
- Dated 19 Mar 2020Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations 2016 — 1st Amendment, 2020
- Dated 27 Sep 2023Duty to Supply Electricity on Request and Power to Recover Expenditure Regulations, 2016 — 3rd Amendment, 2023
- Dated 22 Jul 2026Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations, 2016 — 4th Amendment, 2026
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.