HERC · Haryana Electricity Regulatory Commission
Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations 2016 — 1st Amendment, 2020
Haryana Electricity Regulatory Commission Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations 2016 (1st Amendment) Regulation, 2020.
AmendmentDated 19 Mar 2020HERC/ 34/ 2016/ 1st Amendment / 2020 dated The 19th March, 2020
Amends the Duty to Supply Electricity on Request, Recovery of Expenditure and Security Regulations, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the first amendment to HERC's 2016 Duty to Supply Regulations, notified on 19 March 2020 and taking effect from publication in the Haryana Government Gazette, a date the text does not print (p1). It substitutes two provisions, inserts one proviso and restates a third, all in the parent 2016 regulations.
Regulation 4.12.2 is replaced wholesale (p1–2). It sets the framework for a Developer that opts under Regulation 3.10 to build the electrical infrastructure in its own development area: work must go through a licensed electrical contractor; the electrification plan, execution plan and phase-wise cost estimates need prior licensee approval and the Developer pays supervision charges; execution is capped in number of phases and years, with a longer phasing allowed for large development areas and a contiguity condition on each phase. The licensee must issue a demand notice for a bank guarantee in each phase, and the new sub-paragraphs give it remedies — encashing, extending against a larger guarantee, or cancelling the electrification plan and all guarantees — when a phase overruns or the work is non-conforming. Completion is verified and certified, or inspected suo motu, and all guarantees must be irrevocable, unconditional and valid beyond the phase completion period.
A further proviso inserted after Regulation 4.8.1 (p3) deals with when service connection charges are payable for supply through an independent feeder. Regulation 4.8.2(iii) (p3) is replaced so that a utility may connect several applicants to an existing independent feeder where right-of-way or similar problems exist, restricted to HT categories, with metering mandatory at the consumer end. By clause 1.3–1.4 the amendment reaches all Distribution and Retail Supply licensees, including deemed licensees, and all consumers in Haryana, including entities exempted under Section 13 of the Act (p1).
Read with this
The regulation
Amendments and corrections
- Dated 27 Sep 2023Duty to Supply Electricity on Request and Power to Recover Expenditure Regulations, 2016 — 3rd Amendment, 2023
- Dated 27 Sep 2023Duty to Supply Electricity on Request, Power to Recover Expenditure and Power to Require Security Regulations, 2016 — 2nd Amendment, 2023
- Dated 22 Jul 2026Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations, 2016 — 4th Amendment, 2026
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.