Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Standards of Performance of Licensees Relating to Consumer Services (Second Amendment) Regulations, 2013

West Bengal Electricity Regulatory Commission (Standards of Performance of Licensees Relating to Consumer Services) (Second Amendment) Regulations, 2013

AmendmentDated 7 Jan 2014Published in the Gazette 7 Jan 2014No. 61/WBERC dated 7th January, 2014

Amends the Standards of Performance of Licensees Relating to Consumer Services Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page extraordinary Gazette notification in which the West Bengal Electricity Regulatory Commission makes the second amendment to its 2010 consumer-service Standards of Performance Regulations (p1). Notification No. 61/WBERC is dated 7 January 2014 — despite the year '2013' in its own title — and comes into force on Gazette publication, also 7 January 2014 (p1).

Regulation 2 substitutes regulation 13.19 of the principal Regulations (p1–2). It converts the Grievance Redressal Officer, the Chief Grievance Redressal Officer and the Ombudsman from recommenders into determiners: the Commission delegates its own powers under s.57(2) and s.43(3) of the Electricity Act 2003 to them so they may determine, and direct payment of, compensation and penalty.

Regulation 3 substitutes paragraph (e) of regulation 15.0 (p2), which is the operative heart of the amendment. It replaces the compensation calculation with a methodology: compensation equals the consumer's actual loss caused by a failure to meet the standards of performance, subject to a ceiling built on the maximum rates in (a)–(d) and a per-day floor expressed as a percentage of the amount computed at those maximum rates; the compensable period runs from the date the claim arises to the earlier of the order date or the date the grievance is removed; penalty under s.43(3) is the shortfall between the maximum daily rate and the compensation actually determined; and penalty plus any interest is deposited into a Commission-operated fund named for the licensee, whose corpus and interest are released into the distribution licensee's power-purchaser fund to reduce the retail-end tariff.

It is a short, self-contained amendment — no schedules, tables or forms — aimed at distribution licensees, their grievance officers and consumers in West Bengal.

Standard name
Standards of Performance
Primary topics
Standards of performance, Consumer grievance redressal (CGRF), Electricity ombudsman

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document