WBERC · West Bengal Electricity Regulatory Commission
Standards of Performance of Licensees Relating to Consumer Services (First Amendment) Regulations, 2013
West Bengal Electricity Regulatory Commission (Standards of Performance of Licensees Relating to Consumer Services) (First Amendment) Regulations, 2013
AmendmentDated 26 Aug 2013Published in the Gazette 26 Aug 2013No. 57/WBERC dated 26th August, 2013
Amends the Standards of Performance of Licensees Relating to Consumer Services Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the First Amendment to the West Bengal Electricity Regulatory Commission (Standards of Performance of Licensees Relating to Consumer Services) Regulations, 2010, notified as No. 57/WBERC and published in the Kolkata Gazette Extraordinary on 26 August 2013; it takes effect on the date of publication (p1).
Clauses 2–11 largely rewrite the new-connection regime in regulation 4 of the principal Regulations. They insert a definition of the 'Grievance Redressal Regulations' (p1); reset the time limits for giving LV and MV supply where mains augmentation, cable or overhead-line extension is needed, with a seasonal allowance for drawing LT/HT lines across paddy land (pp1–2); and rework the 'new substation' pathway — how and when a licensee must tell an applicant that a substation is needed, refund of earnest money, the techno-commercial feasibility study and the deadline for communicating its outcome by voltage class, the cases where a connection must be given without any study (electrified village agglomerations and urban areas), connections falling in future government-funded electrification schemes, viability tests for irrigation and short-term irrigation supply, submission of proposals for investment approval and issue of quotations, and the consequences of non-payment (pp2–4).
Clauses 12–14 deal with operations: handling of group failures, the requirement to publish interruption and load-shedding data on the licensee's website with a unique interruption reference number, a consumer objection route through the licensee and ultimately the Commission, and a prescribed reliability formula — introduced in phases and fully operational from 01.04.2015 (pp4–5).
Clauses 15–17 set meter replacement and inspection timelines distinguishing urban and rural areas, and provide for cut-outs to prevent overloading (p6).
The remaining clauses build an enforcement and compensation mechanism: delegation of the Commission's section 57(2) power to Grievance Redressal Officers, CGROs and the Ombudsman to determine compensation (p6); a complaints and compensation procedure with rate slabs for delay, delay in reconnection and wrongful disconnection (pp6–8); a 90-day limitation on claiming compensation, interest on delayed payment, and carve-outs for right-of-way, land acquisition, technical non-feasibility and lack of transmission capacity, plus a land non-availability exemption for want of a sub-station site (pp8–9). Clause 22 adds Annexure-D, the format for displaying outage and load-shedding data (pp9–10).
Read with this
The regulation
Amendments and corrections
- Dated 7 Jan 2014Standards of Performance of Licensees Relating to Consumer Services (Second Amendment) Regulations, 2013
- Dated 14 Nov 2019Standards of Performance of Licensees Relating to Consumer Services Regulations, 2010 — Third Amendment, 2019
- Dated 20 Feb 2020Standards of Performance of Licensees Relating to Consumer Services (Fourth Amendment) Regulations, 2020
Commencement notices and reasons
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.