Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Standards of Performance of Licensees Relating to Consumer Services Regulations, 2010 — Third Amendment, 2019

West Bengal Electricity Regulatory Commission (Standards of Performance of Licensees Relating to Consumer Services) (Third Amendment) Regulations, 2019

AmendmentDated 14 Nov 2019Published in the Gazette 21 Nov 201963 /WBERC dated 14th November, 2019

Amends the Standards of Performance of Licensees Relating to Consumer Services Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the third amendment to WBERC's consumer-services standards of performance, issued as Notification No. 63/WBERC from Kolkata on 14 November 2019 and published in the Extraordinary Gazette of 21 November 2019 (p1). It extends to the whole of West Bengal and comes into force on gazette publication (p1).

Paragraph 2 inserts a new definition of "notified voltage" into regulation 2.1 of the principal regulation — the voltage notified by the Government of West Bengal, with intimation to the Central Electricity Authority, up to which self-certification of an installation is to be carried out (p1).

The operative core is paragraph 3, which adds regulations 3.1.4 and 3.1.5 (p2). Every distribution licensee must, within one year of gazette publication, build an online system to receive applications, generate a quotation based on the required load (in kVA/kW), collect payment and issue a unique trackable application number for new connections, load extension or alteration of service, with supply-office assistance for consumers. Any gap between the provisional payment and actual expenditure is adjusted in the consumer's first six months' bills, and a newspaper notice — four dailies, at least one in Bengali and one in English — must be published at least a month before roll-out, with the Commission's prior approval.

The remaining paragraphs are deregulatory clean-ups (p2): deletion of regulation 3.2.1(a), removal of the words "Pollution Clearance" from regulation 13.11, deletion of paragraph 6 of Annexure-A1 and paragraph 10 of Annexure-B, and substitution of paragraph 8 of Annexure-B with a revised self-certification declaration tied to notified voltage and excluding mines, oil fields and railways.

Standard name
Standards of Performance
Primary topics
Standards of performance, New connections and load changes, Connection and miscellaneous charges

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document