Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Standards of Performance of Licensees Relating to Consumer Services (Third Amendment) Regulations, 2019

West Bengal Electricity Regulatory Commission (Standards of Performance of Licensees Relating to Consumer Services) (Third Amendment) Regulations, 2019

Draft amendmentDated 12 Jun 2019No. XX/WBERC dated xx.xx.2019

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the West Bengal Electricity Regulatory Commission's Third Amendment to its 2010 Standards of Performance of Licensees Relating to Consumer Services Regulations (p1). Clause 1 supplies the short title, extends the regulations to the whole of West Bengal, and brings them into force on publication in the Official Gazette (p1).

The operative text is short and entirely about how consumers apply for supply. Clause 2 inserts a new definition of "notified voltage" after clause (xix) of regulation 2.1 — a voltage notified by the Government of West Bengal, with intimation to the Central Electricity Authority, for fixing the voltage level up to which self-certification is allowed (p1). Clause 3 inserts two new regulations after regulation 3.1.3: one requiring every distribution licensee to build, within one year, an online system for receiving and processing applications and payments for new supply, load extension or alteration of service, with automated estimates based on the requisitioned load and with application tracking, and requiring the detailed consumer procedure to be folded into the licensees' regulation 13.13 procedures; the other requiring a month's prior newspaper notice, in Bengali and English, with the Commission's prior approval, before the system goes live (p2). Clause 4 deletes clause (a) of regulation 3.2.1 (p2).

Clauses 5 and 6 touch Annexure-B, the application/declaration form: paragraph 8 is replaced with a declaration that the installation is to be supplied at notified voltage or below, excludes mines, oil fields and railways, and requires either a self-certificate received by the Electrical Inspector's office or an Electrical Inspector certificate; paragraph 10 is deleted (p2).

Standard name
Standards of Performance
Primary topics
New connections and load changes, Standards of performance, Electrical safety

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document