Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Standards of Performance of Licensees Relating to Consumer Services Regulations, 2010

West Bengal Electricity Regulatory Commission (Standards of Performance of Licensees Relating to Consumer Services) Regulations, 2010

RegulationDated 31 May 2010Published in the Gazette 31 May 2010No. 46/WBERC dated the 31st May, 2010

4 amendments to it are on Voltaic, the latest dated 20 Feb 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software, from pages 1 to 23 of 36. Check the regulator's original before you rely on it.

This is WBERC's principal consumer-service standards regulation, made under the Electricity Act 2003 and issued as Notification No. 46/WBERC dated 31 May 2010 (p1). It applies across West Bengal and comes into force on Gazette publication (p1). It replaces the 2005 distribution licensees' standards regulations, with savings for past actions (p21).

Regulation 2 defines key terms and voltage/category concepts (pp1–3). Regulations 3–4 lay out the application, inspection, quotation, earnest-money and new-connection process, with distinct time limits for LV/MV and HV/EHV, urban/rural, and cases needing augmentation, new transformers, bays or new substations (pp3–8). Regulation 5 covers load extension and Regulation 6 alteration of service (pp8–9). Regulation 7 governs transfer of service/meter on change of ownership, occupancy or purpose (pp9–11).

Consumer-facing operating standards follow. Regulation 8 prescribes complaint-management structures: ZRCs, CRCs, MCSUs and centralized call centres (pp11–12). Regulation 9 sets restoration timeframes for different interruptions, planned outages, website disclosure of interruptions, and a phased start for website reporting from 1 April 2013 (pp12–15). Regulations 10 and 11 cover voltage complaints and meter/metering faults (pp15–16). Regulation 12 covers removal, tariff conversion and load reduction (pp16–17). Regulation 13 adds miscellaneous provisions on force majeure, DC-to-AC changeover, forms and offices (pp17–19).

Enforcement is through complaint registration, the Grievance Redressal Officer and Ombudsman, with compensation payable for failure to meet standards (pp19–21). Regulation 16 requires an annual report, and Regulations 17–19 cover modification, removal of difficulty and repeal (p21). Form-1 and Annexure-A appear at pp22–23.

Standard name
Standards of Performance
Primary topics
Standards of performance, New connections and load changes, Consumer grievance redressal (CGRF)

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document