APERC · Andhra Pradesh Electricity Regulatory Commission
Wheeling and Retail Sale of Electricity Tariff, 2005 — Eighth Amendment, 2026 — Draft
Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity) Eighth Amendment Regulation, 2026
Draft amendmentDated 18 Feb 2026
Draft
A proposal that has since been finalised as the Regulation 01 of 2026 — Eighth Amendment.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Commission has issued a draft Eighth Amendment to the 2005 APERC (Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity) Regulation. The draft recites that the existing monthly FPPCA pass-through, capped at Rs. 0.4 per unit, causes tariff shocks, uncertainty for industry, disputes between property owners and new tenants over prior-consumption true-ups, and cash-flow stress for the Distribution Licensee (pp1-2). The Commission's stated view is to eliminate the cap so that monthly bills reflect actual fuel and power purchase cost variations more accurately and cost-reflectively (pp1-2).
Clause 1 gives the short title, extends the regulation to the whole State of Andhra Pradesh, and commences it from 01.04.2026 (p2). Clause 2 substitutes the text under sub-clause 12.5 of the parent Regulation with a new FPPCA formula, FPPCA = (APPC-BPPC)xPPQ/S, and defines APPC, BPPC, PPQ and S (pp2-3). It also lays out the manner of recovery/refund and conditions A-H: automatic monthly recovery/refund; computation and billing in the (n+2)th month; uniform pass-through across all consumer categories by consumption; forfeiture of the right to recover if the licensee fails to bill on time (except force majeure), with refunds treated differently; monthly reporting to the Commission and website publication; annual true-up/down through the ARR or separate proceedings; financing costs for delayed true-up/down; billing of the Government for 100% subsidised consumers; pre-billing website disclosure; and updating billing/procurement software (pp3-5). A format for reporting source-wise energy and cost variances is set out at p6. The draft is signed by the Commission Secretary i/c on 18-02-2026 and carries a blank regulation number.
Read with this
The regulation
- Published in the Gazette 14 Nov 2005Wheeling and Retail Sale of Electricity Tariff Regulation, 2005
Amendments and corrections
- Dated 6 Mar 2014Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity, 2005 — First Amendment Regulation, 2014
- Dated 2 Jul 2021Tariff for Wheeling and Retail Sale of Electricity — Second Amendment to Regulation 4 of 2005, 2021
- Dated 29 Apr 2022Wheeling and Retail Sale Tariff Regulation, 2005 — Third Amendment, 2022
- Dated 5 Feb 20245th Amendment through Reg. No. 1 of 2024
- Dated 7 Feb 20246th Amendment through Reg. No. 2 of 2024
- Dated 4 Dec 2025Regulation 9 of 2025 Seventh Amendment
- Dated 17 Mar 2026Regulation 01 of 2026 — Eighth Amendment
Commencement notices and reasons
- Dated 28 Mar 2023Wheeling and Retail Sale of Electricity Tariff, 2005 — Fourth Amendment Regulation, 2023 — Statement of Reasons
- Dated 4 Dec 2025Wheeling and Retail Sale of Electricity Tariff Regulation, 2005 — Seventh Amendment, 2025 — Statement of Reasons and Regulation
- Dated 17 Mar 2026Wheeling and Retail Sale of Electricity Tariff, 2005 — Eighth Amendment Regulation, 2026
Procedures and orders made under it
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 12 Apr 2022Wheeling and Retail Sale Tariff, 2005 — Third Amendment Regulation, 2022
- Dated 14 Jul 2023Wheeling and Retail Sale of Electricity Tariff Regulation, 2005 — Fifth Amendment — Draft
- Dated 26 Mar 2025Wheeling and Retail Sale of Electricity Tariff Regulation, 2005 — Seventh Amendment, 2025 — Draft
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.