Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Wheeling and Retail Sale of Electricity Tariff, 2005 — Eighth Amendment, 2026 — Draft

Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity) Eighth Amendment Regulation, 2026

Draft amendmentDated 18 Feb 2026

Draft

A proposal that has since been finalised as the Regulation 01 of 2026 — Eighth Amendment.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Commission has issued a draft Eighth Amendment to the 2005 APERC (Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity) Regulation. The draft recites that the existing monthly FPPCA pass-through, capped at Rs. 0.4 per unit, causes tariff shocks, uncertainty for industry, disputes between property owners and new tenants over prior-consumption true-ups, and cash-flow stress for the Distribution Licensee (pp1-2). The Commission's stated view is to eliminate the cap so that monthly bills reflect actual fuel and power purchase cost variations more accurately and cost-reflectively (pp1-2).

Clause 1 gives the short title, extends the regulation to the whole State of Andhra Pradesh, and commences it from 01.04.2026 (p2). Clause 2 substitutes the text under sub-clause 12.5 of the parent Regulation with a new FPPCA formula, FPPCA = (APPC-BPPC)xPPQ/S, and defines APPC, BPPC, PPQ and S (pp2-3). It also lays out the manner of recovery/refund and conditions A-H: automatic monthly recovery/refund; computation and billing in the (n+2)th month; uniform pass-through across all consumer categories by consumption; forfeiture of the right to recover if the licensee fails to bill on time (except force majeure), with refunds treated differently; monthly reporting to the Commission and website publication; annual true-up/down through the ARR or separate proceedings; financing costs for delayed true-up/down; billing of the Government for 100% subsidised consumers; pre-billing website disclosure; and updating billing/procurement software (pp3-5). A format for reporting source-wise energy and cost variances is set out at p6. The draft is signed by the Commission Secretary i/c on 18-02-2026 and carries a blank regulation number.

Standard name
Wheeling and Retail Supply Tariff Regulations
Primary topics
Fuel and power purchase cost adjustment, Subsidy and cross-subsidy, ARR and true-up

Read with this

The regulation

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document