Wheeling and Retail Sale of Electricity Tariff Regulation, 2005 — Consolidated up to the Eighth Amendment, 2026

Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity) Regulation, 2005

Consolidated copyDate not statedRegulation No. 4 of 2005

A consolidated copy of the Wheeling and Retail Sale of Electricity Tariff Regulation, 2005, published by APERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity) Regulation, 2005 (Regulation No. 4 of 2005) is the State's framework for setting distribution and retail supply tariffs. Made under clauses (zd)–(zf) of s.181(2) read with ss.61 and 62 of the Electricity Act 2003, it applies to every distribution licensee in Andhra Pradesh and splits each licensee's business into a Distribution (wires) business and a Retail Supply business, each with its own Aggregate Revenue Requirement — the first as the basis for wheeling charges, the second for retail tariffs (p5). The copy here is a consolidated reprint: page 1 lists eight amendments from 2014 to 2026, and superscript markers throughout show which clause each amendment inserted or replaced.

Part I (pp2–5) carries the commencement clause — into force on publication in the A.P. Gazette — plus the definitions, a short-title and extent clause, and the rule that control periods normally run five years, the first being three (p3).

Part II (pp5–14) sets the process. Existing ARR computation guidelines stay alive until replaced; a default split of each cost head between wires and retail supply applies until actual segregated accounts exist (p6); and filing timelines are fixed — ARR applications 120 days before the first year of a control period (90 days for the first), tariff orders within 120 days, newspaper and website publication with downloadable spreadsheet filings, and a bar on revising tariffs more than once a financial year save for FPPCA (pp6–8). Separate filing requirements for wheeling and for retail sale follow (pp9–10), as does the Resource Plan obligation (p11) and the multi-year framework under which items are classed controllable or uncontrollable, uncontrollable variations pass through with financing cost on the lag, and controllable gains or losses are shared (pp11–14).

Part III (pp14–27) is the computational core: what each ARR contains, merit-order power procurement, the monthly FPPCA formula with its billing, reporting, forfeiture and true-up conditions, bad-debt treatment, transmission and load dispatch charges, O&M norms, return on capital employed via WACC on the Regulated Rate Base, capital investment approval, depreciation, income tax, and full-cost tariffs with subsidy mechanics — including a wheeling-charge exemption for clean energy and RE manufacturing projects at the same voltage level (p26).

Part IV (pp27–29) covers periodic and end-of-control-period reviews and the Commission's powers to amend, relax and remove difficulties.

Standard name
Multi Year Tariff Regulations, Wheeling and Retail Supply Tariff Regulations
Primary topics
Wheeling and retail supply tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

The regulation

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document