Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Wheeling and Retail Sale of Electricity Tariff Regulation, 2005 — Fifth Amendment — Draft

Fifth Amendment to Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity) Regulation, 2005

Draft amendmentDated 14 Jul 2023

Draft

A proposal that has since been finalised as the 5th Amendment through Reg. No. 1 of 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The draft Fifth Amendment rewrites large parts of the APERC (Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity) Regulation, 2005 — the framework under which Andhra Pradesh distribution licensees file their Aggregate Revenue Requirement and wheeling and retail supply tariffs. The introduction recites the 2005 Principal Regulation (Regulation 4 of 2005) and its amendment and adoption history, then sets out four DISCOM requests: treating variations in sales and revenue as uncontrollable, recognising market-purchase expenditure as working capital, allowing a bad-debt provision, and allowing contingency reserves (p1–2). The operative text is made under s.181(2)(zd)–(zf) read with ss.61 and 62 of the Electricity Act, 2003 (p2).

Clauses 1–2 name the amendment, extend it to the whole State, tie commencement to Gazette publication, and substitute clause 5 with a table apportioning each cost head between the Distribution/Wires Business and the Retail Supply Business (p2–3). Clauses 3–7 rebuild the filing procedure: the ARR filing horizon for each business, deletion of one sub-clause, a compliance statement on past directives, public notice in English and Telugu dailies, website disclosure in downloadable spreadsheet form, a fixed window for the Commission to decide a complete application, publication of approved tariffs, and a bar on revising tariffs more than once a financial year except through FPPCA (p3–5).

Clauses 8–13 require a cost-of-service model per consumer category, let the Commission call for further information and issue filing guidelines, classify additional ARR items as controllable or uncontrollable in both businesses, and set out how gains and losses on each class are passed through or shared, including financing cost for the time lag (p5–7). Clause 14 restates the ARR heads, adds contingency reserves, and lists the components of the Retail Supply ARR (p8). Clauses 15–17 cover bad-debt provisioning and recovery, full-cost tariffs and subsidy handling including State subsidy schedules and quarterly reporting, and new Commission powers to issue practice directions, remove difficulties and relax provisions (p8–10).

The document is a draft dated 14.07.2023, issued by order of the Commission at Hyderabad.

Standard name
Wheeling and Retail Supply Tariff Regulations
Primary topics
Tariff determination, ARR and true-up, Cost of supply and cost allocation

Read with this

The regulation

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document