Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Wheeling and Retail Sale of Electricity Tariff, 2005 — Eighth Amendment Regulation, 2026

Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity) Eighth Amendment Regulation, 2026

Statement of reasonsDated 17 Mar 2026Regulation No. 01 of 2026 dated 17.03.2026

The commission's reasons for the Wheeling and Retail Sale of Electricity Tariff Regulation, 2005 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is APERC's combined Statement of Reasons and final order adopting the Eighth Amendment to its 2005 wheeling and retail supply tariff regulation (Regulation No. 4 of 2005). Pages 1–9 record the Commission's reasoning on seven sets of objections to a draft published for comment on 18.02.2026; pages 10–13 carry the finalised amendment as Regulation No. 01 of 2026; page 14 is the monthly FPPCA reporting format and page 15 lists the objectors.

The operative change is the substitution of clause 12.5 (p10). It removes the existing cap on the monthly Fuel and Power Purchase Cost Adjustment pass-through and replaces the computation with a formula built on actual weighted average power purchase cost, the base cost approved in the Retail Supply Tariff Order, power purchase quantum and actual sales (p10–11). Recovery or refund becomes automatic through consumer bills, built on the actual costs of the nth month and shown in the (n+3)th month (p11) — the Commission moved from the draft's N+2 basis to N+3 at the DISCOMs' request (p4). The T&D loss input is the lower of actual monthly losses or the annual figure approved in the RSTO (p11, p5). Actual power purchase cost continues to be shared across DISCOMs in proportion to actual monthly drawal, while cost and energy from Distributed Renewable Energy projects is allocated exclusively to the hosting DISCOM (p13). Subsidy billing to the Government under Section 65 is preserved (p13), one week's advance web publication and a monthly data filing format are required (p12–13), and the Commission pays financing cost on true-up/true-down amounts (p13).

The Commission declined requests for monthly T&D loss norms, month-by-month approval of FPPCA, and a volatility band (pp4–7). It comes into force on 01.04.2026 (p10).

Standard name
Wheeling and Retail Supply Tariff Regulations
Primary topics
Fuel and power purchase cost adjustment, Losses and loss reduction, Subsidy and cross-subsidy

Read with this

The regulation

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document