Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity, 2005 — First Amendment Regulation, 2014

Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity) First Amendment Regulation, 2014

AmendmentDated 6 Mar 2014Published in the Gazette 7 Mar 2014Regulation No.1 of 2014 dated 06-03-2014

Amends the Wheeling and Retail Sale of Electricity Tariff Regulation, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is APERC's First Amendment to its 2005 Terms and Conditions for Determination of Tariff for Wheeling and Retail Sale of Electricity (Regulation No.4 of 2005), issued as Regulation No.1 of 2014 and gazetted on 7 March 2014 (p1).

The Introduction explains the problem it fixes: since the second control period began in FY 2009-10 the Commission has allowed distribution licensees to file retail-supply ARRs and tariffs annually instead of for a five-year block, driven by uncertainty over power-procurement quantum and cost, corridor constraints, and shortfalls in hydel and gas generation (pp1–2). Meanwhile Regulation No.1 of 2003, which had let licensees recover power-purchase cost variation through a quarterly fuel surcharge, was repealed by Regulation No.2 of 2013, leaving licensees to accumulate variations until end of control period — with what the Commission calls an unacceptably high carrying-cost burden (p2). The amendment therefore provides for annual true-up of power-purchase cost variation.

Operatively it inserts new sub-clause 12.5 into Part III of the Principal Regulation (pp2–5). It specifies how the licensee must compute and claim the prior-year power-purchase cost variance, which procurement quantity to measure it against, the treatment of provisional versus audited figures, the algebra for the true-up amount (including a deduction for ineligible items and financing interest), how the true-up sum feeds into the Commission-approved purchase cost, and that no expense or rebate enters ARR unless detailed in the tariff order. A stepped numeric worked example illustrates the formula (pp4–5), a note excludes FY 2012-13 variances already recovered through FSA and defers one formula term to FY 2015-16 onwards (pp3–4), and a Format for filing quantity and element-wise cost data is annexed (p6).

The regulation applies only so long as retail-supply tariffs are filed annually (p2).

Standard name
Wheeling and Retail Supply Tariff Regulations
Primary topics
ARR and true-up, Wheeling and retail supply tariff, Fuel and power purchase cost adjustment

Read with this

The regulation

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document