Summary
Summary written by software. Check the regulator's original before you rely on it.
The Delhi Electricity Regulatory Commission issued this Explanatory Memorandum on 27 June 2017 to accompany the draft DERC Business Plan Regulations, 2017, which it had posted on its website for stakeholder comment (p1). Its stated purpose is to explain the rationale and objective behind the draft, which is to fix, for the Control Period FY 2017-18 to FY 2019-20, the parameters that the DERC Tariff Regulations, 2017 require the Business Plan Regulations to carry (p1–2). Comments were invited through public notices in English, Hindi, Urdu and Punjabi, and the deadline was extended to 18 July 2017 (p1).
Sections 2 and 3 set the legal hook — Regulations 3 and 4 of the Tariff Regulations, 2017, which list the parameters the Business Plan Regulations must contain and require them to be read as part of those regulations — and explain that the draft simply adopts the Tariff Regulations' definitions (p1–3).
The bulk of the document then walks through each parameter in turn, quoting the draft clause and adding the Commission's reasoning. Sections 4–6 cover financial parameters: the base rate of return on equity for generation, transmission and distribution, with an additional return for the retail supply business; the margin allowed over SBI's one-year MCLR for interest on loans, computed utility-by-utility from actual loan portfolios; and tentative capital investment plans for the generating, transmission and distribution licensees together with truing-up arrangements for capital cost variation (p3–13).
Sections 7–12 cover operating norms: normative O&M expenses (generation in Rs lakh/MW, transmission bay- and circuit-km-wise, distribution per circuit-km and per MVA for each DISCOM), the escalation factor derived from CPI and WPI, and separate treatment of the 7th Pay Commission impact; Normative Annual Plant Availability Factor and Plant Load Factor; gross station heat rate for the Delhi gas stations; auxiliary energy consumption split into fixed and variable parts; and transmission system availability for fixed-cost recovery (p14–39).
Sections 13–20 cover commercial and incentive mechanisms: incentive sharing for refinancing of loans; the mechanism and ceiling for recovering Power Purchase Cost Adjustment charges; incentive sharing on sale of surplus power; a contingency limit for sale through the Deviation Settlement Mechanism; Renewable Purchase Obligation targets; collection efficiency and distribution loss targets with over/under-achievement sharing formulae; and the ratio for allocating ARR between wheeling and retail supply business (p39–54).
Throughout, the Commission justifies its choices by reference to CERC's 2014 Tariff Regulations, other SERCs' regulations and orders, APTEL judgments, Ministry of Power and MNRE orders, UDAY, and the past performance of the Delhi utilities. It is a consultation document rather than an operative instrument: it explains what the draft would do and why.
Read with this
The regulation
- Dated 31 Jan 2017Terms and Conditions for Determination of Tariff Regulations, 2017
Amendments and corrections
- Dated 10 Mar 2017Terms and Conditions for Determination of Tariff Regulations, 2017 — Corrigendum
- Dated 29 Mar 2023Terms and Conditions for Determination of Tariff Regulations, 2017 — First Amendment, 2023
- Dated 30 Apr 2026Terms and Conditions for Determination of Tariff Regulations, 2017 — Second Amendment, 2026
Commencement notices and reasons
Procedures and orders made under it
- Dated 10 Jun 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery for April 2026
- Dated 10 Jul 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery order, 2026
- Dated 10 Aug 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery for June 2026
- Dated 10 Nov 2026Relaxation under Regulation 172 of the Terms and Conditions for Determination of Tariff Regulations, 2017 — FPPAS recovery for September 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 27 Dec 2016Terms and Conditions for Determination of Tariff Regulations, 2016 — Draft
- Dated 27 Dec 2016Annexure or form: Formats for ARR & Tariff Filing by Power Utility — Appendix-2, Terms and Conditions for Determination of Tariff Regulations, 2016
- Dated 27 Dec 2016Public notice: Draft Terms and Conditions for determination of Tariff Regulations, 2016 — Public Notice
- Dated 25 Jun 2021Terms and Conditions for Determination of Tariff (First Amendment) Regulations, 2021 — Draft
- Dated 13 Jan 2023Terms and Conditions for Determination of Tariff (First Amendment) Regulations, 2023 — Draft
- Dated 13 Jan 2023Comments received: Public Notice Inviting Comments on Draft Business Plan, Tariff and REC-RPO Regulations, 2023
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.