DERC · Delhi Electricity Regulatory Commission
Terms and Conditions for Determination of Tariff Regulations, 2017 — Second Amendment, 2026
Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) (Second Amendment) Regulations, 2026.
AmendmentDated 30 Apr 2026In force from 1 Jun 2026F.3(758)/Tariff-Engg./DERC/2025-26/8553
Amends the Terms and Conditions for Determination of Tariff Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Delhi Electricity Regulatory Commission notification that substitutes the fuel and power purchase adjustment surcharge (FPPAS) mechanism in the DERC (Terms and Conditions for Determination of Tariff) Regulations, 2017. Made under s.181 read with s.61 and s.86(1)(b) of the Electricity Act, 2003, it applies from 1 June 2026 and is expressly tied to power procurement by the Delhi DISCOMs from 1 April 2026 (p1).
Regulation 2 replaces Regulation 134 of the Principal Regulations wholesale (p1–5). FPPAS becomes an automatic monthly pass-through of changes in fuel cost, power purchase cost and inter-/intra-state transmission charges, billed by the distribution licensee without prior regulatory approval but subject to annual true-up. Billing happens in the (n+2)th month relative to the month of supply, with an explanation worked through April/June and February/April examples (p2). The surcharge is levied on the consumer's energy and fixed charges and is capped, with amounts above the ceiling carried forward within the financial year (p2). Failure to bill positive FPPAS in time forfeits recovery, including at true-up; failure to refund negative FPPAS brings it back at an enhanced carrying cost, both with a force majeure carve-out (p2–3). Clause (j) sets out the formula and defines every variable — units procured, bulk sale, incremental power purchase cost, actual and base transmission charges, the cumulative adjustment F, Z, average billing rate and the loss percentages — and excludes deviation settlement, ancillary services and SCED charges from power purchase cost (p3–5). Licensees must publish computations and recovery details on their websites, run a unified billing system, and file monthly computations, quarterly statutory auditor certificates and an affidavit in the prescribed format (p3, p10). Clause (k) ends FPPAS claims based on the 30.09.2021 tariff order, while clause (l) allows recovery for the intervening period at DISCOM-specific rates from the Commission's last PPAC order, overriding clause 30 of the Business Plan Regulations, 2023 (p5).
Regulation 3 deletes Principal Regulations 135 and 136 without stating any savings (p5). Annexure-I (p6–9) works four numeric scenarios through the formula, the cap and the cumulative deficit. Annexure-II (p10) is the officer's affidavit and verification format.
Read with this
The regulation
- Dated 31 Jan 2017Terms and Conditions for Determination of Tariff Regulations, 2017
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 10 Jun 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery for April 2026
- Dated 10 Jul 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery order, 2026
- Dated 10 Aug 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery for June 2026
- Dated 10 Nov 2026Relaxation under Regulation 172 of the Terms and Conditions for Determination of Tariff Regulations, 2017 — FPPAS recovery for September 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 27 Dec 2016Terms and Conditions for Determination of Tariff Regulations, 2016 — Draft
- Dated 27 Dec 2016Annexure or form: Formats for ARR & Tariff Filing by Power Utility — Appendix-2, Terms and Conditions for Determination of Tariff Regulations, 2016
- Dated 27 Dec 2016Public notice: Draft Terms and Conditions for determination of Tariff Regulations, 2016 — Public Notice
- Dated 25 Jun 2021Terms and Conditions for Determination of Tariff (First Amendment) Regulations, 2021 — Draft
- Dated 13 Jan 2023Terms and Conditions for Determination of Tariff (First Amendment) Regulations, 2023 — Draft
- Dated 13 Jan 2023Comments received: Public Notice Inviting Comments on Draft Business Plan, Tariff and REC-RPO Regulations, 2023
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.