DERC · Delhi Electricity Regulatory Commission
Terms and Conditions for Determination of Tariff Regulations, 2016 — Draft
Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2016
Draft regulationDated 27 Dec 2016
Draft
A proposal that has since been finalised as the Terms and Conditions for Determination of Tariff Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Delhi Electricity Regulatory Commission's principal regulation for determining tariffs for generation, transmission, wheeling and retail supply in the National Capital Territory of Delhi (p2). It is made under the Electricity Act, 2003 and comes into force on Gazette publication, remaining in force until amended or repealed; existing projects already under commercial operation before commencement are to be tariffed under the prior DERC generation, transmission and distribution tariff regulations (p2). It applies where the Commission is required to determine tariff, but does not cover projects whose tariff is discovered through Section 63 competitive bidding or renewable generating stations tariffed under other DERC instruments (p3). If two or more distribution licensees supply the same area, the Commission may fix ceiling tariffs or parameters to promote competition (p2–3).
Part 1 (p2–13) sets commencement, extent and application and defines the core concepts used throughout: control period, ARR, business plan, COD, capital cost, change in law, utility and related terms. Part 2 (p14–18) requires the Commission to issue a Business Plan Order for each control period and specifies the parameters and utility data—generation, transmission and distribution norms, capital investment, sales, loss and collection-efficiency trajectories—that feed into that order. Part 3 (p19–21) covers tariff petitions: MYT petitions by generating entities and transmission licensees, annual petitions by distribution licensees, and auditor-certified financial statements.
Part 4 (p22–23) lays out filing and processing of petitions, public posting, prudence check, tariff orders, e-filing and suo motu action. Part 5 (p24–42) specifies the ARR components: capital cost, IDC, IEDC, additional capitalisation, de-capitalisation, renovation and modernisation, infirm power, deposit schemes, forex variation, debt-equity, Return on Capital Employed through the Regulated Rate Base and WACC, interest on loan, depreciation, working capital, O&M, non-tariff income and other-business income.
Part 6 (p43–52) specifies recovery: capacity and energy charges for generating stations, transmission charges, distribution ARR, cost of power procurement, DSM treatment and power purchase cost adjustment. Part 7 (p53–58) sets operational norms and truing-up principles, including which variations are controllable or uncontrollable, regulatory asset treatment, deviation charges, incentive and disincentive, and sharing of distribution loss and collection-efficiency impacts. Part 8 (p59–60) contains miscellaneous powers—practice directions, removal of difficulties, relaxation, interpretation and amendment. Appendix-1 (p61–63) gives the asset-wise depreciation schedule.
Read with this
The regulation
- Dated 31 Jan 2017Terms and Conditions for Determination of Tariff Regulations, 2017
Amendments and corrections
- Dated 10 Mar 2017Terms and Conditions for Determination of Tariff Regulations, 2017 — Corrigendum
- Dated 29 Mar 2023Terms and Conditions for Determination of Tariff Regulations, 2017 — First Amendment, 2023
- Dated 30 Apr 2026Terms and Conditions for Determination of Tariff Regulations, 2017 — Second Amendment, 2026
Commencement notices and reasons
Procedures and orders made under it
- Dated 10 Jun 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery for April 2026
- Dated 10 Jul 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery order, 2026
- Dated 10 Aug 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery for June 2026
- Dated 10 Nov 2026Relaxation under Regulation 172 of the Terms and Conditions for Determination of Tariff Regulations, 2017 — FPPAS recovery for September 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 25 Jun 2021Terms and Conditions for Determination of Tariff (First Amendment) Regulations, 2021 — Draft
- Dated 13 Jan 2023Terms and Conditions for Determination of Tariff (First Amendment) Regulations, 2023 — Draft
- Dated 13 Jan 2023Comments received: Public Notice Inviting Comments on Draft Business Plan, Tariff and REC-RPO Regulations, 2023
- Dated 27 Dec 2016Annexure or form: Formats for ARR & Tariff Filing by Power Utility — Appendix-2, Terms and Conditions for Determination of Tariff Regulations, 2016
- Dated 27 Dec 2016Public notice: Draft Terms and Conditions for determination of Tariff Regulations, 2016 — Public Notice
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.