Terms and Conditions for Determination of Tariff Regulations, 2016 — Draft

Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2016

Draft regulationDated 27 Dec 2016

Draft

A proposal that has since been finalised as the Terms and Conditions for Determination of Tariff Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Delhi Electricity Regulatory Commission's principal regulation for determining tariffs for generation, transmission, wheeling and retail supply in the National Capital Territory of Delhi (p2). It is made under the Electricity Act, 2003 and comes into force on Gazette publication, remaining in force until amended or repealed; existing projects already under commercial operation before commencement are to be tariffed under the prior DERC generation, transmission and distribution tariff regulations (p2). It applies where the Commission is required to determine tariff, but does not cover projects whose tariff is discovered through Section 63 competitive bidding or renewable generating stations tariffed under other DERC instruments (p3). If two or more distribution licensees supply the same area, the Commission may fix ceiling tariffs or parameters to promote competition (p2–3).

Part 1 (p2–13) sets commencement, extent and application and defines the core concepts used throughout: control period, ARR, business plan, COD, capital cost, change in law, utility and related terms. Part 2 (p14–18) requires the Commission to issue a Business Plan Order for each control period and specifies the parameters and utility data—generation, transmission and distribution norms, capital investment, sales, loss and collection-efficiency trajectories—that feed into that order. Part 3 (p19–21) covers tariff petitions: MYT petitions by generating entities and transmission licensees, annual petitions by distribution licensees, and auditor-certified financial statements.

Part 4 (p22–23) lays out filing and processing of petitions, public posting, prudence check, tariff orders, e-filing and suo motu action. Part 5 (p24–42) specifies the ARR components: capital cost, IDC, IEDC, additional capitalisation, de-capitalisation, renovation and modernisation, infirm power, deposit schemes, forex variation, debt-equity, Return on Capital Employed through the Regulated Rate Base and WACC, interest on loan, depreciation, working capital, O&M, non-tariff income and other-business income.

Part 6 (p43–52) specifies recovery: capacity and energy charges for generating stations, transmission charges, distribution ARR, cost of power procurement, DSM treatment and power purchase cost adjustment. Part 7 (p53–58) sets operational norms and truing-up principles, including which variations are controllable or uncontrollable, regulatory asset treatment, deviation charges, incentive and disincentive, and sharing of distribution loss and collection-efficiency impacts. Part 8 (p59–60) contains miscellaneous powers—practice directions, removal of difficulties, relaxation, interpretation and amendment. Appendix-1 (p61–63) gives the asset-wise depreciation schedule.

Standard name
Multi Year Tariff Regulations
Primary topics
Tariff determination, Multi Year Tariff (MYT), ARR and true-up

Read with this

Commencement notices and reasons

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document