DERC · Delhi Electricity Regulatory Commission

Relaxation under Regulation 172 of the Terms and Conditions for Determination of Tariff Regulations, 2017 — FPPAS recovery for September 2026

In the matter of: Relaxation under Regulation 172 of the Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 and its amendments thereof.

OrderDated 10 Nov 2026F.3(758)/Tariff-Engg./DERC/2025-2026/8991 dated 10/11/2026

Made under the Terms and Conditions for Determination of Tariff Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

DERC issues a short, two-page order dated 10 November 2026 (F.3(758)/Tariff-Engg./DERC/2025-2026/8991) giving the three Delhi distribution licensees a one-off relaxation from the Fuel and Power Purchase Adjustment Surcharge (FPPAS) provisions of the Tariff Regulations 2017 as amended (p1).

The recitals frame the problem: Regulation 134(d) of the DERC Tariff (Second Amendment) Regulations, 2026 caps FPPAS recovery at ten percent (10%) per billing cycle, and Regulation 134(k) disallows FPPAS claims built on the FY 2021-22 Tariff Order dated 30.09.2021. BRPL and BYPL represented on 15.10.2026 and TPDDL on 19.10.2026 that actual power purchase cost for September 2026 had risen steeply over the base cost approved in that Tariff Order. The DISCOMs claimed FPPAS of 44.29%, 39.26% and 30.42% respectively; the Commission's prudence check settled on 40.77%, 36.45% and 26.60% (p1).

The Commission attributes the spike to El Niño-driven deficient monsoon demand, outages at Central Generating Stations and low coal stocks, which forced scheduling from costlier gas-based State Generating Stations (p1), and records that Regulation 172 was already used for April, May and June 2026.

Operative para 1 overrides Regulations 134(d) and 134(k) so that BRPL, BYPL and TPDDL may recover, over and above the ten percent cap, an additional FPPAS for September 2026 of 7.94%, 7.43% and 8.50% respectively, recoverable for one month from the date of the order (p2). Para 2 saves all other provisions of the 2017 Regulations and the 2026 Second Amendment (p2). The order is signed by two Members and the Chairperson.

Standard name
Tariff Regulations
Primary topics
Fuel and power purchase cost adjustment

Read with this

Commencement notices and reasons

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document