DERC · Delhi Electricity Regulatory Commission
Relaxation under Regulation 172 of the Terms and Conditions for Determination of Tariff Regulations, 2017 — FPPAS recovery for September 2026
In the matter of: Relaxation under Regulation 172 of the Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 and its amendments thereof.
OrderDated 10 Nov 2026F.3(758)/Tariff-Engg./DERC/2025-2026/8991 dated 10/11/2026
Made under the Terms and Conditions for Determination of Tariff Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
DERC issues a short, two-page order dated 10 November 2026 (F.3(758)/Tariff-Engg./DERC/2025-2026/8991) giving the three Delhi distribution licensees a one-off relaxation from the Fuel and Power Purchase Adjustment Surcharge (FPPAS) provisions of the Tariff Regulations 2017 as amended (p1).
The recitals frame the problem: Regulation 134(d) of the DERC Tariff (Second Amendment) Regulations, 2026 caps FPPAS recovery at ten percent (10%) per billing cycle, and Regulation 134(k) disallows FPPAS claims built on the FY 2021-22 Tariff Order dated 30.09.2021. BRPL and BYPL represented on 15.10.2026 and TPDDL on 19.10.2026 that actual power purchase cost for September 2026 had risen steeply over the base cost approved in that Tariff Order. The DISCOMs claimed FPPAS of 44.29%, 39.26% and 30.42% respectively; the Commission's prudence check settled on 40.77%, 36.45% and 26.60% (p1).
The Commission attributes the spike to El Niño-driven deficient monsoon demand, outages at Central Generating Stations and low coal stocks, which forced scheduling from costlier gas-based State Generating Stations (p1), and records that Regulation 172 was already used for April, May and June 2026.
Operative para 1 overrides Regulations 134(d) and 134(k) so that BRPL, BYPL and TPDDL may recover, over and above the ten percent cap, an additional FPPAS for September 2026 of 7.94%, 7.43% and 8.50% respectively, recoverable for one month from the date of the order (p2). Para 2 saves all other provisions of the 2017 Regulations and the 2026 Second Amendment (p2). The order is signed by two Members and the Chairperson.
Read with this
The regulation
- Dated 31 Jan 2017Terms and Conditions for Determination of Tariff Regulations, 2017
Amendments and corrections
- Dated 10 Mar 2017Terms and Conditions for Determination of Tariff Regulations, 2017 — Corrigendum
- Dated 29 Mar 2023Terms and Conditions for Determination of Tariff Regulations, 2017 — First Amendment, 2023
- Dated 30 Apr 2026Terms and Conditions for Determination of Tariff Regulations, 2017 — Second Amendment, 2026
Commencement notices and reasons
Procedures and orders made under it
- Dated 10 Jun 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery for April 2026
- Dated 10 Jul 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery order, 2026
- Dated 10 Aug 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery for June 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 27 Dec 2016Terms and Conditions for Determination of Tariff Regulations, 2016 — Draft
- Dated 27 Dec 2016Annexure or form: Formats for ARR & Tariff Filing by Power Utility — Appendix-2, Terms and Conditions for Determination of Tariff Regulations, 2016
- Dated 27 Dec 2016Public notice: Draft Terms and Conditions for determination of Tariff Regulations, 2016 — Public Notice
- Dated 25 Jun 2021Terms and Conditions for Determination of Tariff (First Amendment) Regulations, 2021 — Draft
- Dated 13 Jan 2023Terms and Conditions for Determination of Tariff (First Amendment) Regulations, 2023 — Draft
- Dated 13 Jan 2023Comments received: Public Notice Inviting Comments on Draft Business Plan, Tariff and REC-RPO Regulations, 2023
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.