Skip to content

CERC · Central Electricity Regulatory Commission

Payment of Fee Amendment Regulations, 2006 — Gazette compilation of four amendments

Gazette – Payment of fee Amendment Regulations, 2006

AmendmentDated 13 Dec 2006Published in the Gazette 13 Dec 2006185 dated DECEMBER 13, 2006

Amends the Open Access in Inter-state Transmission Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a single Gazette of India (Extraordinary) issue, Part III Section 4, No. 185, dated 13 December 2006, which carries four separate CERC notifications issued on 7 and 11 December 2006. Each is a short amendment to an existing CERC regulation, made under section 178 of the Electricity Act, 2003, and each comes into force on publication in the Gazette (p2, p4, p6, p7).

The first substitutes the entire Schedule of the CERC (Payment of Fee) Regulations, 2004 with a new fee structure listing, application by application, the fee payable to the Commission — generation tariff applications, transmission tariff applications, other applications (excluding licence applications but including provisional tariff), interlocutory applications, inspection of judicial records and certified copies (pp2–3). This is the only part of the compilation that carries a price table.

The second amends the Indian Electricity Grid Code (Second Amendment), 2006. It rewrites Clause 1.3(iii) of Chapter 1 to treat the Bhakra Beas Management Board and Sardar Sarovar Project generating stations as intra-State generating stations even though their transmission systems remain part of the ISTS, and keeps scheduling and dispatch with BBMB and the Narmada Control Authority, coordinated with the RLDC and beneficiaries. It also rewrites Clause 6.3 of Chapter 6 to have WRLDC formulate a separate scheduling and dispatch procedure for SSP in consultation with NCA (pp4–5).

The third amends Regulation 14 of the CERC (Open Access in inter-State Transmission) Regulations, 2004 by inserting a new clause (v) on releasing leftover transmission capacity to short-term and long-term customers, with a cut-off for eligible entities to advise requirements (p6).

The fourth amends Regulation 3 of the CERC (Procedure for making of application for determination of tariff…) Regulations, 2004 by adding a proviso that publishing notice of an application for approval of provisional tariff is not necessary (pp7–8). Each notification ends with a note recording when the principal regulations were originally notified and, where relevant, previously amended.

Standard name
Fees and Fines Regulations, Grid Code, Open Access Regulations, Tariff Regulations
Primary topics
Fees payable to the Commission, Grid operation and grid code, Open access

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document