Skip to content

CERC · Central Electricity Regulatory Commission

Open Access in Inter-state Transmission Regulations, 2004

Central Electricity Regulatory Commission (Open Access in Inter-state Transmission) Regulations, 2004

RegulationDated 30 Jan 2004Published in the Gazette 6 Feb 2004No. L-7/25(4)-2003 dated 30th January, 2004

3 amendments to it are on Voltaic, the latest dated 13 Dec 2006.

Later regulations on Voltaic change some of its provisions: Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 and Open Access in inter-State Transmission Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission (Open Access in Inter-state Transmission) Regulations, 2004 create the framework under which generators, licensees and consumers obtain and pay for access to the inter-state transmission system. They were issued by notification No. L-7/25(4)-2003 dated 30 January 2004 and gazetted on 6 February 2004 (p1, p20), and are made under Section 178 of the Electricity Act, 2003 (p20).

Regulation 1 brings everything into force on Gazette publication except Regulation 6(iii), the snap-bidding provision, which starts after 90 days; during that window short-term reservation runs on first-come-first-served basis (p20). Regulations 2–3 define the vocabulary and confine the regulations to inter-state transmission access (pp20–22). Regulation 4 splits transmission customers into long-term (25 years or more) and short-term (all others, with each reservation capped at one year), deeming existing beneficiaries of CTU regional systems to be long-term customers (pp22–23).

Regulations 5–7 set the criteria for granting access — Grid Code planning criteria for long-term, inherent margins and spare capacity for short-term — establish priority of long-term allotment over short-term reservation, provide for snap bidding where short-term demand exceeds available capacity, and require non-discrimination between open access customers and an integrated entity's self-use (pp23–25). Regulations 8–14 fix the nodal agencies (CTU or the transmission licensee whose system hosts the drawal point for long-term; RLDC for short-term), the application contents and fees, the Bulk Power Transmission Agreement requirement, the Commission-approved exit route for relinquishment or transfer, and the consequences of non-utilisation of reserved capacity (pp25–28).

Regulations 15–21 cover money: treatment of persons already using the system, sharing of annual transmission charges between long-term customers, the formula-based short-term rate and its provisos (including the north-eastern UCPTT case), scheduling and system operation charges, UI charges and reactive energy charges (pp28–31). Regulation 22 and its table fix maximum processing times by service duration (pp31–32), and Regulation 23 sets curtailment priority. Regulations 24–36 then standardise commercial conditions, require special energy meters and energy-loss bearing, mandate Grid Code compliance, lay down collection and disbursement (including an RLDC handling charge), prescribe the web-based open access information system with publication deadlines, create a grievance route to the RPC Member Secretary escalating to the Commission, and give CTU a coordination role over RLDC procedures (pp32–36).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Transmission tariff

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document