Open Access in inter-State Transmission Regulations, 2008

Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2008

RegulationDated 25 Jan 2008No.L-7/105(121)/2007-CERC dated 25th January, 2008

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2008, issued by CERC on 25 January 2008, create the framework for using surplus inter-State transmission capacity by open access customers. They apply to open access applications for energy transfer schedules commencing on or after 1 April 2008 (p1). The regulations define bilateral and collective transactions, open access customers, long-term customers, nodal agencies, intra-State and regional entities and related terms (p1–3), and give long-term customers first priority for designated use; open access is limited to surplus capacity from design margins, flow variations and spare transmission capacity (p3–4).

Operationally, the Central Transmission Utility is to issue a detailed procedure approved by the Commission for residual matters (p4). The nodal agency is the Regional Load Despatch Centre for bilateral transactions and the National Load Despatch Centre for collective transactions (p4). Applications must be made to the nodal agency with prescribed details and fee, and State Load Despatch Centre concurrence or no-objection/standing clearance is required where a State utility or intra-State entity is involved (p4–6). The regulations set separate scheduling tracks: advance scheduling for future months, congestion management by electronic bidding where needed, first-come-first-served scheduling for nearer-term and day-ahead transactions, and contingency scheduling (p6–9). They also cover revision and cancellation of schedules and curtailment for transmission constraints or grid security (p9–10).

The remaining chapters specify charges and their payment, default consequences, UI accounting for State utilities and intra-State entities, reactive energy treatment, special energy meters, transmission-loss absorption, Grid Code compliance, collection and disbursement of charges, dispute redressal, mandatory website disclosures, and savings/repeal of the 2004 open access regulations (p10–19). The 2004 Regulations’ short-term provisions are repealed on 1.4.2008, while their long-term customer provisions continue until separate regulations are notified (p19).

Standard name
Open Access Regulations
Primary topics
Open access, Scheduling and despatch, Open access charges

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗